FloRite® Multi-String Multilateral Completion System

For Multilateral Wells that Require Complete Junction Pressure Isolation

The FloRite® multilateral completion system is specifically designed for wells that require full junction pressure isolation while allowing re-entry capability to access the laterals through the completion. This capability eliminates the need to pull the completion should access be required for clean up, stimulation or data acquisition. Applied to TAML level 2 through 4 junctions, the FloRite system converts them to level 5. Prime candidates are injection wells, gas wells or wells with different pressure regimes. Production from each lateral can be completely segregated to surface with the installation of a dual completion, or with the use of the optional Vector Block, a single string completion can be installed while allowing selective access to either lateral or mainbore.

Benefits
  • Turning Level 4 systems into a sealed junction; in both new and re-entry applications
  • Junction placement becomes less dependent on local fracture gradients, pore pressures, competence, etc.
  • Junction integrity is not challenged when applied to gas and high-pressure injector wells
  • Dual-flow paths allow for segregated production or injection from different reservoir layers
  • Alternatively comingled production with thru-tubing re-entry into both laterals is also possible
  • Systems can be stacked in series

FloRite® Multi-String Multilateral Completion System (TAML Level 5)

Filter By  
Количество записей на странице Show     results per page
  TitleНазвание  DateДата
Related Information

Related InformationДополнительная информация