The FloRite multilateral completion system provides TAML Level 5 junction pressure integrity and re-entry capability without pulling the upper completion. Re-entry access to the lateral improves the efficiency of future interventions and workover operations. The FloRite system has the capability to upgrade an existing TAML Level 4 junction to a TAML Level 5 should the requirement for pressure isolation be identified as the well matures.
Production from each lateral can be segregated to surface with the installation of a dual completion; an optional vector block facilitates single-string commingled flow. An intelligent comletion interface enables monitoring and flow control of each lateral branch, helping you maximize hydrocarbon recovery.
MATURE FIELDS
FloRite TAML Level 5 multilateral completion system provides junction isolation and helps eliminate gas migration
READ MOREFloRite Completion System adds Level 5 pressure isolation and selective re-entry access to an existing level 4 multilateral junction.
Success Rate
Level 5 Installations
Data Sheet
For multilateral wells that require complete junction pressure isolation