Search

Single-trip intelligent control installation and monitoring 

Halliburton FlexRite multilateral completion systems maximize reservoir contact by creating an unlimited number of laterals with TAML Level 5 pressure sealed junctions. Applicable in new or re-entry wells with a variety of completion options, these stackable junctions feature a large ID to allow for single-trip deployment of multizone SmartWell® monitoring and control systems. Variations include long lateral liner deployments and existing well re-entry applications. 

With our FlexRite systems, you can reduce CAPEX by enabling more wells per surface location, greatly improving field economics and minimizing environmental impact.

New product

FlexRite® Selective Access multilateral system

Facilitating the execution of multilateral well strategies in challenging reservoir conditions, by providing efficient access to hydrocarbon reserves, resulting in enhanced productivity while simultaneously reducing time, costs, and environmental impact.

Explore FlexRite

Explore Halliburton FlexRite solutions

FlexRite® selective access multilateral completion system

FlexRite® selective access multilateral completion system

The Halliburton FlexRite multilateral system is robust, versatile, and configurable for TAML Level 5 pressure sealed junctions

Explore
icon

HART ENERGY / August 2018

Unlocking production with multilateral wells

The combination of directional drilling and MWD technologies made horizontal drilling more manageable and wells more productive.

READ ARTICLE

Explore Halliburton multilateral system solutions

FloRite® Multilateral Completion System

FloRite® Multilateral Completion System

The FloRite multilateral completion system provides TAML Level 5 junction pressure integrity and re-entry capability without pulling the upper completion.

Explore
IsoRite® multilateral completion system

IsoRite® multilateral completion system

The IsoRite multilateral completion system provides through-tubing re-entry capability in TAML Level 2 and 4 wells.

Explore
MillRite® Milled Exit Multilateral Completion System

MillRite® Milled Exit Multilateral Completion System

The MillRite milled exit multilateral system provides consistent and geometrically controlled casing exit.

Explore

The current systems have overall reliabilities ranging from 95.7% to 99.6%, with a trend toward 100%. This increase was achieved as installation efficiencies and well complexity increased.

Read article
Over 60 trilateral and quadlateral wells delivered globally with our FlexRite® multibranch inflow control (MIC) multilateral system
Over 60 trilateral and quadlateral wells delivered globally with our FlexRite® multibranch inflow control (MIC) multilateral system.
140+ 

MIC level 5 junctions

50+

Tri-lateral wells

90%

Subsea installations

FlexRite® Multibranch Inflow Control (MIC) system 

Our unlimited stackable system allows for a multilateral well to be completed with a multitude of completion and control options — sand screens, swellable packers, Inflow Control Devices (ICDs) and Interval Control Valves (ICVs) — while providing pressure integrity at the junction. This helps you increase reservoir exposure and maximize production from each multilateral leg. 

Advantages 

  • Simple design and quickest installation
  • Full hydraulic isolation and mechanical integrity of the junction
  • Compatible with single trip monitoring and flow control systems at every lateral
  • Unparalleled reliability and customer support 
Quad-lateral completion with the Halliburton FlexRite MIC system
Quad-lateral completion with the Halliburton FlexRite MIC system.

ReFlexRite® MLT system

The award-winning ReFlexRite system is a re-entry multilateral solution that enables new lateral branches to be added to existing wells where no preparations were originally made to accommodate a multilateral junction.  This enables access to unproduced reservoir sections on existing platforms without performing slot recovery operations or sacrificing production of existing wellbores.  A ReFlexRite multilateral well is completed with the FlexRite multilateral completion system, providing a TAML 5, hydraulically isolated junction. The system comes with SmartWell® completion options, enabling independent control and monitoring of both the existing main bore and the new laterals.

Advantages

  • Utilizes the XtremeGrip® MLT anchor packer to create a permanent junction orientation anchor with industry-leading strength, pressure, and torque ratings
  • Compatible with FlexRite completion systems and multiple milled exit systems delivering unparalleled reliability and service quality

 

Case Study

ReFlexRite MLT system

Enables access to unproduced reservoir sections on existing platforms without performing slot recovery operations or sacrificing production of existing wellbores.  Provides a TAML Level 5, hydraulically isolated junction and is compatible with intelligent completion options.

Read Case Study

ReFlexRite TAML Level 5 MLT completion system - retrofit app

03:58
ReFlexRite TAML Level 5 MLT completion system - retrofit app
icon

Ready to Take the Next Step?

Talk with a Halliburton completion expert

Get in touch