Halliburton designs and delivers cementing solutions tailored to meet the unique pressure, temperature, and operator requirements of each well
Talk to an expertTo deliver a successful primary cementing job, our cementing experts optimize fluid loss, rheology, thickening time and compressive strength. Halliburton tailors solutions designed to maximize production in high temperature, corrosive, and lost circulation environments. Our objective is to ensure the cement sheath protects the casing, withstands cumulative stresses from pressure testing, well testing and stimulation treatments, and delivers zonal isolation for the life of the well.
Reduced Portland content helps customers lower carbon emission baselines and provides engineered systems with enhanced barrier performance.
ExploreCementing solutions designed for stability in high temperature geothermal wells.
ExploreCorrosion resistant annular barriers and digital solutions that enable the construction of superior carbon capture and long-term storage wells.
ExploreInnovative technologies to minimize well control problems caused by seepage to total lost circulation.
Explore