MillRite® Milled Exit Multilateral System

The MillRite® junction is constructed using a track-guided milling system creating a consistent, geometrically controlled window to create a high-strength TAML level 4 junction. This construction process eliminates "rolloff" and dogleg severity problems associated with conventionally milled windows and allow repeatable lateral re-entry for the life of the well. It utilizes the successful multilateral washover operation and achieves hydraulic integrity using cement. The MillRite system can also be used to construct a TAML level 2 junction.

Benefits

  • Applicable to existing (re-entry) and new wells
  • Precise window geometry
  • Window geometry and position control allows repeatable lateral re-entry for life of well
  • Compatible with IsoRite® isolated multilateral completion system and FloRite® multi-string multilateral completion system
  • Allows existing main well to be produced to lower economic threshold
  • Lower installation and maintenance costs relative to other level 4 systems
  • Single trip window machining

MillRite® Milled Exit Multilateral System (TAML Level 2 or 4)

Filter By  
Количество записей на странице Show     results per page
  TitleНазвание  DateДата
Summary Summary MillRite® JI Milled Exit Multilateral System with Junction Isolation
The MillRite® JI system is part of the SperryRite® advanced reservoir drainage solutions from Sperry Drilling services. It is a combined multilateral drilling and completion system capable of constructing a high quality junction and also providing the required pressure isolation for selective stimulation.
Summary Summary Halliburton sets world record in challenging multilateral application
Engineering capability further differentiates company for growing markets
Summary Summary MillRite® Milled Exit Multilateral System
Create consistent, repeatable, and geometrically controlled exit windows that save time and eliminate costly “roll-off” problems common with conventional milling systems
Summary Summary Integrated Solution More Than Doubles Reservoir Contact
Halliburton Multilateral Services and Intelligent Completions Optimizes Oil Production Offshore Saudi Arabia
Summary Summary MillRite® Milled Exit Multilateral System (TAML Level 2 or 4)
The MillRite® junction is constructed using a track-guided milling system creating a consistent, geometrically controlled window to create a high-strength TAML Level 4 junction.
Related Information

Related Information Дополнительная информация