Search

An integrated approach for wellbore cleanup and displacement 

Did you know that up to 30% of non-productive time (NPT) during the well completion phase is directly related to debris left in the wellbore after drilling? Wellbore debris presents a major risk to the well and completion operations, and managing debris is a critical stage of well construction. 

Halliburton CleanWell Solutions — filtration services, wellbore cleanup fluids, mechanical wellbore cleaning tools, and optimized software modeling — effectively clean your well, preparing it for completion, while prolonging the life of the well for maximized productivity.

icon

North Sea

Combining new technologies brings safety benefits to customer

Intercept® retrievable bridge plug and  Turbo Tech® II valve combined for success

Read case study

Dirty well? Clean it with Halliburton's CleanWell system

05:37
Dirty well? Clean it with Halliburton's CleanWell system
icon

Offshore

CleanWell technology saves two days of rig time

Drill Tech® scrapers allow operator in Azerbaijan to save $850,000

Read case study
icon

Mature Fields

Premium magnet outperforms competition, recovers downhole debris

Operator in Asia Pacific saves $8.1 million, optimizes milling performance using PowerMag® casing magnet.

Read case study
45 m

Successfully underreamed without pack-off issues

$800K

Estimated savings per well for one major operator

30%

Reduction in NPT

4 days

Rig time saved after successfully drilled wells

icon

Ready to Take the Next Step?

Talk with a Halliburton completions expert

Get in touch