181 tool runs and 57 wells completed to date with ZERO NPT
Download PDFDeep Water
Provide wellbore cleanout services for new operator
Africa
Provide wellbore cleanout services for new operator:
In 2019, an international oil company recruited Halliburton to provide deepwater wellbore cleanout solutions in Africa, a region where Halliburton has more recently began to perform wellbore cleanup operations.
This operator sought wellbore cleanup solutions to improve its completion success rate. Because multiple rigs operate simultaneously, careful attention to concurrent operational strategy is crucial. Mobilization of complete tool strings to the location, training local personnel in areas of operations and tool maintenance, and subsequent initial well completion were all necessary within a tight deadline.
Through cooperation amongst the asset, inventory, local, and global teams, tools were mobilized to the location well before the first planned operation. The global team completed pre-job preparation while training local engineers. Global completion and wellbore cleanout teams presented, justified, and implemented recommendations to improve legacy wellbore cleanout procedures. These included combined runs to help reduce time and improve the upper completion success rate.
The collaboration and execution of this contract exemplifies the remarkable achievements that can be accomplished by Halliburton when an operator reaches out and our dedicated employees (both globally and regionally) come together to deliver exceptional solutions.
hours with tools below rotary
wells completed to date
successful tool runs to date
kg collected on downhole magnets
Despite the limited presence of wellbore cleanup operations in Africa, the crew demonstrated exceptional proficiency. The unmatched team experience improved the operator’s approach to cleanup and yielded tangible completion results. More than 180 successful tool runs and 57 wells have been completed to date with ZERO nonproductive time (NPT), which set the benchmark for efficiency and reliability. This project is an example of the strategic mainstays, collaboration, and execution by the team.
Reduce well construction costs with the latest-generation of filtration services, wellbore cleanup fluids, mechanical wellbore cleaning tools, and optimized software modeling.