An operator asked Halliburton to evaluate alternative engineering solutions for temporary well isolation to facilitate replacement of a production wellhead
Case Study
First XtremeGrip® ELH deployed successfully in Ivory Coast
Halliburton deployed the first XtremeGrip® ELH system with a VersaFlex® running tool equipped with a soft-release ball seat (SRBS) in the Ivory Coast.
Case Study
Operator converts observation well into producing well
Retrofit multilateral technology allows operators to access new targets and produce from existing wellbores while production of the slots are still maintained
Case Study
Expandable liner system suits deepwater installations
VersaFlex® ELH LECD system supports wellbore conditions and address instability and losses with string and hydraulic manipulation in Western Australia
Case Study
Endurance Hydraulic Screen systems reduce completion time
Endurance Hydraulic Screen® systems reduce overall completion time in environment with continuous reservoir pressure depletion in offshore Norway