Case Study
Operator lands all casing sections to planned depth
Learn how Protech II™ centralization helped an operator mitigate differential sticking risk to reach total depth in a permeable formation with restrictive IDs.
Discover the most up-to-date case studies, brochures, data sheets, and other resources from Halliburton
Data Sheet
The DPU® actuated tubing perforator was developed in 2006 to provide a nonexplosive circulation solution deployable on (SL) units for the ductile J-55 tubing
View