Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Workover operation cures severe lost circulation

SentinelCem™ Pro cement system helps address challenges with total lost circulation in a vuggy carbonate formation behind the perforated interval.

Case Study

ThermaLock™ cement - Data sheet

ThermaLock™ cement is a non-Portland, low permeability barrier system that is nonreactive with CO2 and is ideal for ultrahigh-temperature applications.

Case Study

Automation solutions enable data-driven decisions to reduce well delivery time

LOGIX® drilling performance optimizer identifies bit wear in real time and optimizes well delivery.

Data Sheet

Octiv® auto frac service - Data sheet

Octiv® Auto Frac service configures the automation settings for fracture stages and the system executes decisions through control of the entire frac spread

Data Sheet

Sensori™ fracture monitoring service - Data sheet

Sensori™ monitoring executes continuous subsurface monitoring and provides data stream fracture results so operators can integrate subsurface changes

Case Study

Operator deploys integrated cemented liner solutions

Halliburton’s MatchSet® liner hanger system integrated with wet shoe sub contributes to successful completion of four wells in Williston Basin, North Dakota

Data Sheet

SSR-II™ cement plugs - Data sheet

SSR-II™ cement plugs are designed to provide mechanical separation and prevent contamination between cement fluids pumped down the landing string.

Data Sheet

TrueSync hybrid permanent magnet motor - Data sheet

TrueSync's hybrid permanent magnet motor is efficient, sustainable, and dependable due to hybrid innovation.

Case Study

Tailored cement solution successful in troublesome onshore field

First operation in Egypt with IsoBond™ cement solution improves CBL results in permeable sands formation with gas influx

Case Study

EV0-Trieve™ RBP successfully recoverd after well shut-in

Operator required installation of a temporary intervention downhole well barrier in a gas well. Halliburton provided an EV0-Trieve RBP for barrier provision.

Results per page: 102550