Plug and Abandonment

End-of-well operations are often more difficult than initial well construction. These plug and abandonment (P&A) operations require maximum efficiency without sacrificing safety—all while limiting impact to the environment.

Halliburton provides the technology and expertise to facilitate safe and efficient operations worldwide for P&A solutions and specialized subsea projects for jacket and subsea tree removal. Our full suite of well abandonment technologies reliably and accurately address a wide range of environments. Integrated and careful planning ensures cost effectiveness, while meeting regulatory and technical requirements.

Split Shot® Cutter
The Split Shot Cutter uses a linear shaped charge to split tubing and casing collars vertically.

Filter By  
Количество записей на странице Show     results per page
  TitleНазвание  DateДата
Related Information

Related InformationДополнительная информация