Improve the reliability of subsea installations with high-performance liner hangers
Talk to an expertThe VersaFlex expandable liner hanger (ELH) system helps operators reduce both risk and capital costs. Evolved from this successful product family, the VersaFlex Big Bore system is designed specifically for the deepwater and subsea markets to address complex well conditions. The system does not require landing in a pre-determined profile, helping to eliminate complications common to positioning in mudline/casing wellhead profiles. Additionally, the VersaFlex Big Bore system does not require liner-top cement integrity to achieve a liner-top seal upon setting. It incorporates casing-placement flexibility that helps eliminate related liner installation issues, and our elastomeric seal technology is unmatched in the industry. The redundant leak-proof design helps eliminate sustained casing pressure. With our ground-breaking clean-form design, the VersaFlex Big Bore system is an all-in-one integral hanger/packer.
Delivers a low-to-moderate load bearing without sacrificing its gas-tight sealing capability or reliability
Enhanced torque ratings for demanding wellbore environments
Reach total depth in extended-reach and long horizontal completions
VersaFlex Big Bore system
XtremeGrip® Big Bore System
It has no moving parts, which helps eliminate costly tool failures associated with conventional liner hangers. CAPEX savings do not end at operations, they continue throughout the life of the well. One of the biggest payoffs for operators is a cost reduction in materials. In most cases, liner overlap is greatly reduced with the VersaFlex Big Bore system because pressure bearing tieback strings are not required. The system also minimizes many of the operating steps required to set the liner hanger/packer, compared to conventional systems while virtually eliminating remediation costs.
Bolivia - case study
First installation of big bore in Bolivia, and first deployment of system on land in Latin America
read case studyWhen well construction challenges in large casing sizes dictate more robust requirements, the VersaFlex Big Bore system can be mated with the metal sealing XtremeGrip hanger body technology. This combined system has all the same reliable functionalities as the VersaFlex Big Bore system, including the ability to overcome challenges such as heavier hang loads and elevated temperatures for an effective 360-degree hydraulically energized metal-to-metal compliant seal with bi-directional anchoring capabilities.
Tiered solutions for geothermal well construction
Field-proven, total system approach to liner installations
High-performance ELHs with enhanced hang-weight capabilities in elevated temperatures
Offer system configurations for cemented and non-cemented land solution applications