Feb 04, 2025 | 07:00 AM CST
registerHalliburton is exhibiting at the SPE Hydraulic Fracturing Technology Conference and Exhibition. Join us, February 4 to February 6, 2025 at The Woodlands Waterway Marriott Convention Center in The Woodlands, Texas.
Stop by and see us in booth #205.
This high-performance frac plug provides zonal isolation of the wellbore during stimulation treatment and customized dissolution times.
OCTIV Auto Pumpdown service controls fluid pumps and a wireline unit as a single, fully automated, closed-loop system to maximize plug and perforating performance.
The ExpressFiber disposable fiber cable is an economic, low-risk fiber solution for cross-well monitoring that provides direct measurement of well interference.
An easy to deploy, cost-effective fracture monitoring solution for continuous measurement and visualization of the subsurface.
Halliburton perforating solutions offer industry-leading technologies, tools, and techniques with an unequaled success and safety record.
Title | Time | Room |
---|---|---|
Successful Implementation CO2 Assisted Hydraulic Fracturing In A Deep And Low Permeability Sandstone Reservoir: First Case In Colombia | 4:25 - 4:50 PM | 223517 |
Title | Time | Room |
---|---|---|
Optimizing Fiber-casing Coupling Efficiency For Horizontal Wellbores: A Lab-scale Investigation Towards Improving Strain Measurements Using Disposable Fiber | 10:05 - 10:20 | 223545 |
Unifying Dfos Diagnostics To Describe Fracture Morphology | 10:05 - 10:20 | 223579 |
Practical Methods For Completing The SCOOP Woodford And Sycamore | 10:05 - 10:20 | 223556 |
Monitoring The Effectiveness Of A Bullhead Refrac Using Temporarily Deployed Fiber Optic Cable | 11:05 - 11:30 | 223536 |
Autofrac: Improving Consistency And Control In Completions | 14:45 - 15:10 | 223511 |
Title | Time | Room |
---|---|---|
Evaluating Offset Strain Response On A Single Wellbore Equipped With Permanent And Disposable Fiber | 10:35 - 11:00 | 223575 |