Search
Opportunity

Unconventionals

Opportunity
Specific Challenge

Complete a 15,382 ft. lateral section with an engineered drilling solution

REGION - USA / TEXAS REGION - USA / TEXAS

Permian Basin, Upton County, Texas

REGION - USA / TEXAS

Overview

A major operator in the Midland basin collaborated with Sperry Drilling to complete the first 15,382 feet (4,688m) lateral section. The Drilling Engineering Solutions (DES) team proposed an engineered drilling solution consisting of the iCruise® intelligent Rotary Steerable System (RSS), GTi drill bit, and NitroForce® high-flow, high-torque motor. The DrillingXpert™ hydraulics modeling software was used to optimize the flow rate for hole cleaning and tool performance. 

The iCruise RSS drilled to total depth in two runs eliminating the need for a third run, exceeding the operator’s expectations. By maintaining optimal drilling parameters and activating cruise control on the iCruise intelligent RSS, the operator reduced well time and achieved the required dogleg to steer accurately within the geological target, maximizing asset value.

15.382

feet of lateral section drilled

2

runs to complete - surpassing operator's expectations

Explore related products

iCruise® intelligent rotary steerable system

iCruise® intelligent rotary steerable system

Reduce well time through fast drilling, fast tripping time and quicker casing drill outs.

Explore
NitroForce® high-torque, high-flow motor

NitroForce® high-torque, high-flow motor

Provides the power and performance to consistently deliver faster and longer runs.

Explore
icon

Ready to take the next step?

Talk with a Halliburton iCruise expert

Get in Touch