Search
Opportunity

Unconventionals

Opportunity
Specific Challenge

Maximize asset value for the operator using an engineered drilling solution

REGION - USA / TEXAS REGION - USA / TEXAS

Midland Basin, Texas

REGION - USA / TEXAS

Overview

A major operator drilling in the Midland basin collaborated with Halliburton to drill a 10,229’ lateral in 36 drilling hours setting a record for drilling days for the operator, beating the previous record by 1.5 days. 

Halliburton listened to the technical challenges and delivered an engineered drilling solution utilizing iCruise® intelligent rotary steerable system with a 8-1/2-inch GeoTech® GTi65DHEO drill bit matched with the NitroForce™ high-torque, high-flow motor. This solution resulted in a basin ROP record of 284 ft/hr over the course of the lateral, with a 24-hour period resulting in 6,859’. Utilizing CruiseControl™ technology, the well was drilled 100% in zone. This run was the culmination of an 8.5 day total well, helping to maximize asset value for the operator. The two section lateral section was drilled in 2.08 days translating to ~$176K savings. 

284

Average ROP (ft/hr)

36

Drilling hours - a new record for the operator

175K

USD saved

Explore related products and services

iCruise® Intelligent Rotary Steerable System

iCruise® Intelligent Rotary Steerable System

Designed for fast drilling, accurate well placement, and reliable performance.

Explore
GeoTech® Fixed Cutter Drill Bits

GeoTech® Fixed Cutter Drill Bits

GeoTech® matrix and steel body drill bits are customized to deliver performance across all drilling applications.

Explore
icon

ready to take the next step?

Talk with a Halliburton Sperry drilling expert

Get in touch