Engineered Drilling Solution Helps Operator Achieve Goal of Drilling One Mile in 24 Hours
Download PDFDeep Water
Achieve goal of drilling one mile in 24 hours
Maria Field, Norwegian Continental Shelf
Wintershall Dea, Europe’s leading independent natural gas and crude oil company, was drilling production wells in the Maria field offshore Norway, where its team had a desire to meet the British Mile Challenge (BMC) of drilling one mile (1609 meters) in 24 hours. Drilling in the harsh environment of the Norwegian Sea, the operator was also up against a complex well trajectory that would require precise directional control to navigate through drops, builds, and turns in the 12 1⁄4-inch section through a mix of soft to tough formations. The newly installed West Mira hybrid rig presented unique challenges, further complicated by several hard stringers and hard formations, which, in the past, had caused tool failures and vibration, affected bit performance. and led to miltiple trips in this location. Since the BMC had not been met in the previous drilling campaign, the team was highly motivated to achieve this goal.
To achieve their BMC goal, the main players needed to be aligned as “one team” comprising Halliburton, Wintershall Dea, and Seadrill.
A method selection strategy was implemented to optimize the well plan. This involved extensive modeling to determine the most durable, high-performance bit (with a redesigned base from a prior campaign), along with a custom bottomhole assembly (BHA) designed expressly for this application. Efficient hole cleaning via the right oil-based drilling fluid was another big concern that had to be modeled in advance to handle the high rates of penetration (ROPs) expected at the start of the run – more than 985 feet/hour (300 meters/hour).
Collaborative, real-time decision making among stakeholders was critical to the job’s success. To ensure excellence all the way through engineering and execution, Halliburton remained fully engaged, monitoring the drilling operations both offshore and remotely from onshore offices. This helped the Wintershall Dea team reach its ambitious goal.
“Well done by everyone to achieve the British Mile Challenge. Now we go for the 2000-meter challenge!
Meters drilled in 24 hours
Rate of penetration (ROP) per hour in feet
Several different Halliburton domains and technologies, together with Wintershall Dea and Seadrill expertise, were leveraged to accomplish this BMC goal:
Halliburton – Integrated multidisciplinary knowledge and proven tools, as follows:
Wintershall Dea – Set a “one team” tone and employed a method selection strategy for all engineering decisions. Additionally, provided wired drillpipe for faster streaming of DrillDOC® sensor data with better drilling mechanics assessment
Seadrill – Provided offshore drilling services, including a semi-submersible, first hybrid rig, fulfilled in an environmentally safe and cost-effective manner
Halliburton was just as committed as Wintershall Dea to the goal of achieving the British Mile Challenge of drilling one mile in 24 hours. This was the first team in the Maria field to reach that goal, and to even exceed the 1609-meter BMC goal by 8 meters, thanks to the aligned parties and advanced technology tools that were key to engineering a solution of top-notch directional drilling, from start to finish.
The entire operation was monitored in real time to view and control all drilling dynamics that were of utmost importance under such high ROP conditions, especially keeping a close eye on the well trajectory. Another record was set, with this being the second time a Maria field section was drilled in just one run – making this the fastest section to be completed in the field.
GeoTech® matrix and steel body drill bits are customized to deliver performance across all drilling applications.
BaraLogix reduces invisible lost time and NPT through advanced hydraulic software, surface measurement automation, and predictive analytics leading to informed decision making.
Custom drilling solutions for increased performance, more accurate planning and monitoring, and greater risk mitigation and safety.