Challenge

  • Install and de-water nine buoyancy modules to the mooring lines of a floating oil production facility​
  • 3,000 feet water depth​
  • Perform the operation from a DP vessel

Solution

  • Halliburton designed a complete coiled tubing (CT) package with 2-3/8” CT downline able to deploy at 3000 feet depth​
  • A ROV was used to enable the tie-ins with each of the buoyancy modules
  • Nitrogen equipment set up to pump from surface via the downline to displace the water

Result

  • Successfully installed and de-watered all nine buoyancy modules​
  • The CT downline solution has been proven as a suitable method for de-watering deep water buoyancy modules from a vessel
9

Buoyancy modules installed

3,000

Feet water depth

Explore featured solutions

Coiled tubing equipment and services

Coiled tubing equipment and services

Coiled tubing solutions offer the latest safety features and technologies to optimize operational efficiency and service reliability.

Explore
Subsea coiled tubing downline service

Subsea coiled tubing downline service

Subsea coiled tubing downlines services offers a rigless deepwater operation option to save costs and operational time

Explore
Pumping and nitrogen equipment

Pumping and nitrogen equipment

Halliburton strives for excellence in well intervention. Our nitrogen and pumping equipment features a variety of tools to handle the toughest jobs.

Explore
icon

Ready to take the next step?

Talk with a Halliburton well intervention expert

Get in Touch