HP/HT Project Experience

For decades, Halliburton has researched and developed tools that enable standard operations in deeper, hotter and higher pressure wells. A selection of case studies highlighting some of Halliburton's HP/HT technologies can be found below.

Halliburton's HP/HT Project History

Filter By  
Количество записей на странице Show     results per page
  TitleНазвание  DateДата
Summary Summary One of the largest drilling contracts in the world outsourced to Halliburton
Halliburton Integrated Project Management enabled operator to accelerate field development by delivering 58 wells on turnkey basis
Summary Summary Halliburton provided reservoir pressure data in extreme conditions
Armstrong Louisiana, LLC set new temperature record during pressure test in South Louisiana
Summary Summary How Halliburton helped a global energy company lower costs of geothermal wells in Indonesia
Global energy company cuts average drilling time for geothermal wells by 70 percent
Summary Summary ADAPTA® 450 - Product Data Sheet
ADAPTA® 450 filtration control agent is a cross-linked polymer that can provide filtration control in oil and synthetic based fluid systems at temperatures up to 450°F (232°C).
Summary Summary Customized Lost Circulation Treatments Help Resolve Severe Losses in Highly Fractured Geothermal Wells
Geothermal wells in Northern California are drilled in highly fractured volcanic reservoirs, where massive fluid losses can bring operations to a halt.
Summary Summary LSNAF System Increases Productivity in HPHT Wells
Åsgardfield in the Norwegian Sea is characterized as having high-temperature, high-pressure field with low permeability sandstone.
Summary Summary Qatar: Engineered PERFORMADRIL® Fluid System with BARACARB® Bridging Agents Helped Save 3 Days of Rig Time and $4M
Qatar Shell Services Company (QSSC ) was planning to drill and core an 8½” reservoir section in an exploration well in the Pre-Khuff formation. The primary target was the Jauf Reservoir, and the Unayzah Reservoir was the secondary target. QSSC was seeking an environmentally-friendly fluid system that could help minimize formation damage and provide optimum shale inhibition for increased wellbore stability over an extended period of time during well logging. As an added challenge, the expected temperature in the reservoir section was expected to be 300°F.
Summary Summary Customized High-Performance NAF Delivers Stable HPHT Wellbore, Saving Significant Time and Cost
Enable operator to drill to total depth with minimal disruption and to obtain accurate logs of the reservoir, despite these conditions: » Highly reactive shale » Abnormal pressures » Depleted zones
Summary Summary Malaysia: Designed ENVIROMUL HT Invert Emulsion Fluid Provides Effective Solution for Controlling ECD on Well with Narrow Drilling Window
Baroid Fluid Services personnel engineered ENVIROMUL HT IEF, a customized invert emulsion fluid system that used fine grind 4.4 SG Barite as the weighting agent. The fluid was specifically engineered to provide ECD control in narrow margin wells while maintaining a low Sag Factor.
Summary Summary Halliburton stimulation treatment increases well’s production by 13,093 barrels of oil per day in an HP/HT reservoir
Successful acid stimulation treatment exceeds customer expectations
Summary Summary Boots & Coots Drills Relief Well for Shallow Target to Kill Catastrophic Blowout
Multidisciplinary response resolves crisis in first attempt
Summary Summary Relief Well Directional Planning
Relief well planning is an interactive process where adjustments in other components of the relief well may trigger changes in the relief well directional plan.
Summary Summary HP/HT Stimulation Snapshot
High Pressure, High Temperature
Summary Summary HP/HT Client Brochure
Delivering success in HP/HT reservoirs through experience, innovation, and reliable technologies
Summary Summary HP/HT Well Construction Snapshot
High Pressure, High Temperature
Summary Summary Subsurface Control Valve III (SSC III)
Subsurface Control Valve III (SSC III) animation. 29.5 MB
Summary Summary Intelligent Completion Advances Target Improved Reliability in HPHT Conditions, Simplified Deployment
New technologies helping to provide real-time fluid characteristics, faster or remote actuations and optimized production over life of the well. Drilling Contractor September 2017 Issue
Summary Summary Mexico: GeoBalance® Optimized Pressure Drilling Service Reduces Operational Costs by Controlling Bottom Hole Pressure and Borehole Instability Sign in required
An operator required a managed pressure drilling (MPD) operation to be performed in one of the highest producing oil fields in the central portion of the State of Tabasco, South Mexico. The deviated well is in a high-temperature environment (253° C / 487° F) with a naturally fractured formation. MPD was needed in a section of the well notorious for kick and lost circulation due to pressure regressions. The nearest offset well had experienced a kick and subsequently lost over 2500 barrels of mud.
Summary Summary Oman: SOLAR Quad-Combo Saves 2-3 Days in HPHT wells Sign in required
In Oman, the operator of two high-temperature land gas wells wanted wireline-quality logs without the time and expense of wireline operations.
Summary Summary North Sea: Drilling Performance Workflow Solution Helps Save 25 Days in HP/HT North Sea Well Sign in required
Halliburton provided a Drilling Performance workflow solution, integrating the expertise and advanced technical capabilities of Baroid, Drill Bits and Services and Sperry Drilling services to meet the specific challenges of the well.
Summary Summary Canada: High Performance Mud Motor Technology Reduces Drilling Costs in Harsh Environment Sign in required
Rising downhole pressures and temperatures on a well in Alberta forced the operator to find alternatives to the turbine they had used to drill the initial stages of the well.
Summary Summary North Sea: GeoForce® Motor and 3D-i™ Software Drill HTHP Well in the North Sea Sign in required
Provide directional drilling and MWD for a 16,000-foot HP/HT exploration well.
Summary Summary Guf of Mexico: GeoTap® Tester Obtains Pressure at 7000 psi to Provide Understanding of Depleted Sand Reservoir Sign in required
Sperry provided a GeoTap tester that could work at up to 10,000 psi overbalance; this was combined with a M/LWD triple combo package and run with Sperry directional drilling services.
Summary Summary Thailand: SOLAR® M/LWD Services Used on Thousands of High-Temperature Wells in the Gulf of Thailand Sign in required
SOLAR® M/LWD Services Used on Thousands of High-Temperature Wells in the Gulf of Thailand
Summary Summary Gulf of Mexico: Sperry M/LWD Tools Perform in Environment Exceeding 30,000 psi Sign in required
Provide M/LWD tools capable of operating in the estimated 30,000 psi or higher pressure environment, drilling a 10,000 foot (3,048 meter) or longer salt section.
Summary Summary Haynesville Shale LA, USA: ExtremeHT-200™ M/LWD Sensors Help Operator Save Over US$145,000 Sign in required
An operator in the Louisiana Haynesville shale play required reliable and accurate measurement/logging-while-drilling (M/LWD) data while drillling horizontal wells in an extreme high temperature environment.
Summary Summary UK North Sea: SOLAR™ Geo-Pilot® XL Rotary Steerable System and SOLAR™ Logging-While-Drilling Tools Enable Drilling of High-Temperature Wells in UK North Sea Sign in required
Sperry Drilling Services was approached by an operator to drill their high-temperature field appraisal campaign in the central sector of the UK North Sea.
Summary Summary South East Asia: Quasar Pulse℠ M/LWD service saves customer approximately USD 1 Million Sign in required
An operator wanted to reduce costs and achieve logging objectives on high-temperature wells drilled from a jack up rig in 243 feet (74 meters) of water, offshore South East Asia, where bottomhole temperatures are among the highest in the world.
Summary Summary Egypt, Mediterranean: Halliburton Delivers Vertical Well in Deepwater High-Pressure High-Temperature Environment and Saves Customer over US $1.8 Million Sign in required
Sperry Drilling was approached by an operator to drill a vertical well in the deepwater, high-pressure high-temperature environment of the Mediterranean Sea, where maximum temperature and pressure were approximately 390° F (199° C) and 20,000 psi.
Summary Summary U.S, Louisiana, Gulf of Mexico: Stellar® LWD Suite Successfully Runs in High-Pressure Environment and Saves Operator $12 Million Sign in required
Two case histories: 1. Stellar® LWD Suite Successfully Runs in High-Pressure Environment and Saves Operator $12 Million 2. Stellar® LWD Suite Wipe Contradicts Existing Log and Saves Operator $170,000
Summary Summary ESTMZ System Sets Industry Records
ESTMZ system sets industry records in GoM Jack/St. Malo project.
Summary Summary XtremeGrip System
High-performance, metal-to-metal liner hanger with enhanced hang-weight capabilities in elevated temperatures.
Summary Summary FS Fluid Loss Control Device
The FS fluid loss control device is designed to provide a means of isolating the formation below the uppermost gravel-pack packer before the upper completion has been run. The FS fluid loss control device provides a reliable solution with benefits that include:
Summary Summary ESTMZ (Enhanced Single-Trip Multizone) System
Enhanced Single-Trip Multizone (ESTMZ™) FracPac™ system is a downhole tool system that allows the stimulation and gravel packing of multiple zones in a single trip of the workstring into the wellbore.
Summary Summary Quasar Trio® M/LWD Triple-Combo Service
The Quasar Trio® M/LWD triple-combo service comprises optional resistivity, azimuthal density, and neutron porosity sensors, which can be added to the required Quasar Pulse™ service collar to provide a complete formation-evaluation service at temperatures up to 200°C (392°F and pressures up to 172 MPa (25,000 psi).
Summary Summary XBAT™ Azimuthal Sonic and Ultrasonic LWD Service
The XBAT LWD service delivers accurate acoustic measurements in a wide range of formations via sensors and electronics.
Summary Summary HP/HT: 6. Total
Halliburton continues to push the limits of HP/HT technologies and processes for increasing efficiency, recovery, safety and reliability
Summary Summary HP/HT: 3. Definition
UltraHT-230 redefines the standard, reliably taking operators to the next level
Summary Summary HP/HT: 1. Overview
Ultra High Temperature - the next fontier for oil and gas exploration
Summary Summary HP/HT: 2. Rethinking
UltraHT-230 M/LWD sensors
Summary Summary Quasar Trio® M/LWD Triple-Combo Service - Thailand R&M Facility Video
Learn the benefits of this service and take a quick tour of the R&M facility. (No audio.)
Summary Summary HP/HT: 5. Depth
UltraHT-230 sensors help make drilling less perilous, more productive and more cost effective than ever before
Summary Summary HP/HT: 4. Testing
UltraHT-230 sensors tested for conditions well beyond anything available today
Summary Summary Operator Saves USD 450.000 in Abrasive, High-Temperature Well
An operator was drilling a gas wellthrough the very hard, abrasive, and high-temperature kaolinitesiltstone formation. The well was proving to be one of the mostchallenging high-temperature applications. The operator challenged Sperry Drilling to drill the 6-inch vertical section of the S-shaped well faster, safer, and on target through the formation.
Summary Summary World's First Extreme-High-Temperature LWD Triple-Combo Run
With extreme bottomhole static temperatures approaching 392°F (200°C), some of the wells in the Gulf of Thailand are among the hottest in the world – far beyond the reach of conventional measurement-while-drilling/logging-while-drilling(M/LWD) tools.
Summary Summary TOTAL S.A. Drills to Record Depths in HP/HT Well and Saves USD 5 Million
Engineered MWD/LWD solution delivers reliable measurements in extreme temperature environment
Summary Summary Tuned® Spacer III Ultra HT spacer fluid
Tuned® Spacer III Ultra HT spacer fluid is designed especially for high temperature applications between 300°F (149°C) and 450°F (232°C). The spacer’s rheological properties (viscosity and yield point) can be designed for specific application in individual well conditions.
Summary Summary ThermaLock™ Cement
ThermaLock™ cement is a specially formulated calcium phosphate cement that is both CO2 and acid resistant. The result of a joint development project for high temperature, geothermal wells, ThermaLock cement is now being promoted as an alternative for Portland cement wherever CO2 may be encountered.
Summary Summary Super Seal II® MR Valve Float Equipment (mechanically retained)
The unique design feature of the high temperature aluminum Super Seal II® MR poppet valve is a mechanically retained sealing element custom molded or the target environment. Utilizing the field proven technology of the Super Seal II® poppet valve engineering, Halliburton offers float valve options to meet 500°F (260°C) wells with valves capable of holding pressure of up to 10,000 psi (68.9 MPa).
Summary Summary LockJar® Multi-Conductor Enhancer
The Enhancer increases effectiveness of the LockJar hydraulic jar impact by utilizing energy stored in a compressed spring stack to increase velocity of the hammer mass as it travels up the well bore when the jar activates.
Summary Summary LockJar® Multi-Conductor Enhancer – Model B
Halliburton’s LockJar® Multi-Conductor E-Line Jar can be run with an Enhancer tool that significantly increases jar impact to free stuck tool strings and preserve logging in open-hole wireline operations.
Summary Summary LockJar Multi-Conductor E-Line Hydraulic Jar – Model S
Halliburton’s LockJar® Multi-Conductor E-Line Jar and Enhancer provide a simple way to help avoid time-consuming and expensive stuck strings and fishing jobs in wireline logging operations.
Summary Summary LockJar Multi-Conductor E-Line Hydraulic Jar
The Enhancer provide a simple way to help avoid time-consuming and expensive stuck strings and fishing jobs in wireline logging operations.
Summary Summary LockJar Multi-Conductor E-Line Hydraulic Jar – Model B
Halliburton’s LockJar® Multi-Conductor E-Line Jar and Enhancer provide a simple way to help avoid time-consuming and expensive stuck strings and fishing jobs in wireline logging operations.
Summary Summary LockJar® Single Conductor E-Line Hydraulic Jar – Model B
Halliburton’s LockJar® Single Conductor E-Line Jar provides a simple way to protect against time-consuming and expensive stuck strings and fishing jobs in cased hole logging and perforating operations.
Summary Summary LockJar Multi-Conductor Enhancer – Model S
Halliburton’s LockJar® Multi-Conductor E-Line Jar can be run with an Enhancer tool that significantly increases jar impact to free stuck tool strings and preserve logging in open-hole wireline operations.
Summary Summary LockJar® Mono-Conductor E-Line Hydraulic Jar
Halliburton’s LockJar® Mono-Conductor E-Line Jar provides a simple way to protect against time-consuming and expensive stuck strings and fishing jobs in cased hole logging and perforating operations.
Summary Summary Halliburton helped set bridge plug in high-pressure environment at record depth
Halliburton saved client a day and a half of nonproductive time in plug and abandonment of deepwater well
Summary Summary Conveyance Method Aids in Large Rigless Production Enhancement, Saving 5 Days of Intervention Time
Successful utilization of e-line tractor in horizontal, high-pressure, and high-temperature gas wells
Summary Summary Armstrong Louisiana, LLC set new temperature record during pressure test in South Louisiana
Halliburton’s record-breaking Hostile Sequential Formation Tester (HSFT-IITM)tool set new standard and delivered reliable pressure data
Summary Summary Advances in Perforating
Halliburton has long been known for the breadth of its perforating technologies. Now we offer solutions for more demanding environments than ever. Introducing new ultra deep penetrating MaxForce™ shaped charges, an ultra high-pressure gun system rated to 30,000 psi, and an electronic firing head that operates with a full suite of safety features even under extreme pressures.
Summary Summary Spectral Density Log (SDL™) Tool-Ultrahigh Pressure
The Halliburton Spectral Density Log (SDL™) tool-Ultrahigh Pressure provides superior measurements of the bulk density (ρb) that is critical to accurate determination of formation porosity.
Summary Summary Reservoir Description (RDT™) Service
When flexibility and versatility are required, the Halliburton Reservoir Description Tool (RDT™) tool collects—in a single deployment—formation pressure, fluid ID, and samples.
Summary Summary LOGIQ® Array Compensated Resisitivity Tool (ACRt™) System
Halliburton's Array Compensated Resisitivity Tool (ACRt™) logging system combines the latest-generation sonde geometry and architecture with state-of-the-art design and software for array induction with unparalleled accuracy and dynamic range.
Summary Summary Halliburton Free-Point Tool (HFPT™) Technology
Conveyance Independent—Will Run Off Most Wireline Units
Summary Summary Mono-Conductor Tension Device
Halliburton’s Mono-Conductor Tension Device (MCTD) provides downhole tension measurements at the cablehead for improved operational control.
Summary Summary ESTMZ™ Enhanced Single-Trip Multizone Completion System
ESTMZ™ Enhanced Single-Trip Multizone system enables isolation and treatment of several intervals during a single trip of the workstring.
Summary Summary Quasar Trio™ M/LWD Triple-Combo Service
Retrieve LWD triple-combo FE data of resistivity, density, and porosity in 200°C environments
Summary Summary Hydraulic Jars
Halliburton’s LockJar® Conductor E-Line Hydraulic Jar provides a simple way to protect against time-consuming and expensive stuck strings and fishing jobs in cased hole logging and perforating operations.
Summary Summary CoreVault® System
Built into the proven Xaminer® Coring Tool, our CoreVault® system can capture up to 10 samples in a sealed container—in one run. Our container safely locks your critical reservoir fluids in your cores. The container prevents reservoir fluids from escaping during core retrieval and transport. Once transported to a laboratory, the reservoir fluids in those cores can be measured and analyzed.
Summary Summary Hydraulic Jars
As part of an integrated risk management system, the Halliburton LockJar® system is the most effective sticking prevention hydraulic jar in the industry.
Summary Summary MaxFire™ Electronic Firing System
Halliburton now offers the MaxFire™ electronic firing system, an ultrahigh-pressure 40,000-psi (276-MPa), fully programmableelectronic firing system. This unmatched technology is alsocapable of low pressure-cycle operation, and allows for immediateor delayed detonation.
Summary Summary The Advanced Perforating Flow Laboratory
The Advanced Perforating Flow Laboratory at Halliburton's Jet Research Center is an industry leader in perforating system research, development and test programs.
Summary Summary Perforating
Halliburton Perforating Services maintains an unequalled success and safety record while continuously developing and introducing new and innovative products for tubing conveyed perforating and wireline perforating.
Summary Summary HF-1 Packer
HF-1 premium packer is a single-string, retrievable, cased-hole packer that features a facility for bypass of multiple electrical and/or hydraulic control lines. Available for use as both the top production packer and as one of many lower packers isolating adjacent zones, the HF-1 packer can operate under higher loads and greater pressures than standard production packers.
Summary Summary DataSphere® ROC™ Permanent Downhole Gauges
ROC™ permanent downhole gauges provide reliable, real-time permanent monitoring of downhole conditions, thereby increasing productivity through the life of the well or reservoir.
Summary Summary HS Interval Control Valve (HS-ICV)
HS-ICV is designed for deepwater environments, and can withstand pressures up to 15,000 psi and temperatures up to 325ºF (163ºC)
Summary Summary High Pressure High Temperature (HPHT)
Delivering success in HP/HT reservoirs through experience, innovation and reliable technologies.
Summary Summary HP/HT Project Experience
Halliburton's HPHT project experience.
Summary Summary HPHT Testing and Design Validation Facilities
HPHT Testing and Design Validation Facilities
Summary Summary Stimulation for High Pressure High Temperature (HP/HT)
Halliburton provides cost-effective High Pressure High Temperature (HP/HT) approaches to fracturing, pinpoint stimulation, acidizing/near-wellbore cleanout and conductivity endurance
Summary Summary Well Completion and Intervention for High Pressure High Temperature (HP/HT)
Halliburton’s High Pressure High Temperature (HP/HT) completion technologies can have long-lasting benefits for the reservoir’s profitability
Summary Summary Well Construction for High Pressure High Temperature (HP/HT)
Halliburton High Pressure High Temperature (HP/HT) engineers designed our well construction products to withstand heat, pressure and cyclical loading over the life of the well
Summary Summary Formation and Reservoir Evaluation for High Pressure High Temperature (HP/HT)
Formation and reservoir evaluation for High Pressure High Temperature (HP/HT)
Summary Summary About HP/HT
About hpht
Summary Summary HP/HT Halliburton Advantage
Halliburton Advantage
Summary Summary HPHT Drilling Solution Helps Increase ROP by 33% in UK North Sea
A major international operator challenged Sperry to deliver faster rates of penetration while drilling a high pressure and/or high temperature (HPHT) hard chalk sequence in its North Sea field.
Summary Summary Diesel-Based Fluid Successful in Deep, High-Pressure Wells
Maximum mud weights in the 17.2 ppg range and hard Pennsylvanian era formations in a West Texas field made drilling slow and challenging.
Summary Summary Fracturing Solution Enables Improved Production
An operator planning an 11,500-ft. TVD Haynesville shale formation well with a 4,000-ft horizontal section was looking for a fracturing solution to maximize production in an area where results are often disappointing.
Summary Summary Ability to Log in Heavy Mud Saves Operator Over $15,000
A Louisiana operator suspected a bad cement bond on a deep, high-pressure, high-temperature well and was preparing to squeeze the well if a good cement bond log could not be obtained.
Summary Summary Expedite® Service Eliminates Proppant Flowback and Increases Gas Production by Approximately $1.8 Million
An operator needed to control proppant flowback after a fracturing treatment in a 16,269-ft high-pressure, high-temperature exploration well in a PP1 formation. The well's bottomhole temperature was 397°F (202.8°C).
Summary Summary DeepQuest HT Service Helps Unlock Hot, Tight GasReservoir
Saudi Aramco faced a high pressure and high temperature (HPHT) stimulation challenge in a new field, with a 375°F (191°C) reservoir temperature and more than 15,000 psi required for fracturing.
Summary Summary SigmaSM Process Using MRIL® Technology Identifies Missed Zone, Adds Production Worth Over $1 Million per Year, and Saves Frac Expenses
In the Cuitlahuac field in Reynosa, PEMEX drilled a strategic well to prove the existence of new gas reserves, so drilling could be extended to include the west part of the field. Well conditions included 3930m depth, 3½-in slim casing completion, and 330°F BHST.
Summary Summary GeoTap® Formation Pressure Tester Saves Operator US $3-6 Million
An operator was drilling a subsalt deepwater [water depth of 4,986 ft (1,520 m)] well in the Gulf of Mexico and required real-time pore pressure measurements of the formation to help optimize mud weight and manage equivalent circulating density (ECD).
Summary Summary Weighted Fracturing Stimulation Fluid Reduced Surface Treating Pressures, Allowing Record-Setting Well Test in Deepwater GOM Project
Chevron’s Jack #2 well at Walker Ridge Block 758 in the Gulf of Mexico (GOM) Lower Tertiary trend is in 7,000 feet of water, with a reservoir target greater than 20,000 feet below mudline. Because of the high fracture gradient and friction in the wellbore tubulars, the surface treating pressure generated by a conventional fracturing fluid system was expected to exceed the 15,000-psi surface equipment safety limitations.
Summary Summary SOLAR® M/LWD Services Used on Thousands of High-Temperature Wells in Gulf of Thailand
Drilling challenging directional wells in a high-temperature environment, the operators of large offshore developments in the Gulf of Thailand required reliable and accurate M/LWD systems that could routinely handle tool temperatures as high as 200°C.
Summary Summary HP/HT Challenges & Solutions
Challenges and Solutions
Summary Summary HP/HT HSE & Service Quality
HSE & Service Quality
Summary Summary High Pressure High Temperature Environments
My completion operation requires equipment that can withstand high pressures and high temperatures (HP/HT). What solutions does Halliburton have to address this?
Summary Summary High Pressure/High Temperature Environments - Lower Tertiary
My completion operation requires equipment that can withstand high pressures and high temperatures (HP/HT). What solutions does Halliburton have to address this?
Summary Summary High Pressure High Temperature (HPHT)
Delivering success in HP/HT reservoirs through experience, innovation and reliable technologies.
Summary Summary SandWedge® Conductivity Enhancement System
SandWedge® Conductivity Enhancement System improves fracturing results and virtually eliminates incompatibility issues for improved long-term production.