Narrow Pressure Margin - Alternative Cement Placement Methods

As water depths and distance to shore increase, operational challenges and budget pressures intensify.  Halliburton has the capability to help with dual-gradient cementing and managed pressure cementing as well as puddle jobs (running a liner into a column of cement already in the wellbore), tack and squeeze cementing and reverse-circulation cementing. 

Solutions for Alternative Cement Placement Methods

Fidelis Stage Cementer
A precision-built, multiple-stage cementing tool constructed to enable placement of cement in stages and to withstand the cyclic loading from geo-mechanical stresses throughout the life of the well.
Reverse Circulation Cementing
Halliburton has the equipment and experienced personnel to support reverse cementing operations where cement is pumped down the annulus with well fluid returned through the casing.