Search
Specific Challenge

Real-Time Diagnostics under live well conditions

REGION - COLOMBIA REGION - COLOMBIA

Colombia

REGION - COLOMBIA

Challenge

  • Perform a Production Logging Tool (PLT) and perforation evaluation under live well conditions, while flowing 42 mmscfpd and 3,200 bpd
  • Minimize the number of trips and amount of equipment required on location to complete job objective
  • Keep the tool string as short as possible to reduce stack height

Solution

  • Halliburton and Wireline collaborated to review the well conditions to perform the operation in one trip while flowing
  • Halliburton proposed the SPECTRUM® FUSION electric and fiber optic system and SPECTRUM® 360 camera with a Wireline PLT
  • SPECTRUM® technology provided a flow through BHA integrating a 360° side-view Camera, GR, CCL, P, T, WOB and Torque sensors, and incorporated the wireline PLT tool

Result

  • In a single run, Halliburton provided a solution to perform the PLT and evaluate the perforations with a real-time video feed
  • Utilizing SPECTRUM® ,  the surface equipment requirements were minimized by combining the CT and Wireline applications
  • SPECTRUM® WOB supplied string forces input, reducing the PLT length string
  • Well production was maintained during the operation, reducing the cost impact

1

Trip to Complete

icon

Ready to take the next step?

Talk with a Halliburton Well Intervention expert

Get in Touch