Search
Opportunity

Mature Fields

Opportunity
Specific Challenge

Long-term well suspension for an unspecified duration

Region

Middle East

Region

Challenges

  • Long-term well suspension for an unspecified duration
  • Reliable RBP to act as barrier 
  • Safe plug retrieval after several years downhole

Solution

  •  7-inch Model 3L RBP 

Results

  • Successful set and retrieval of Model 3L RBP
  • Reliable barrier downhole for 6 years
  • Plug retrieved on first attempt, with zero issues

Overview

A well drilled by an operator in the Middle East required plugging after unforeseen issues halted operations for an unspecified period. In response to the operator’s request for a solution, Halliburton deployed the Model 3L retrievable bridge plug (RBP), which provided the necessary barrier to suspend the well and prevent fluid release to surface over a 6-year period.

Challenge

As part of the campaign, the operator drilled a well with plans to install the upper completion at a later date. However, operational and contractual issues unexpectedly shut down operations and the well had to be plugged. The operator requested Halliburton provide an RBP to act as a reliable, long-term barrier to contain the well fluid during suspension. In addition, the operator wanted the ability to easily retrieve the plug when operations finally resumed.

Solutions

Halliburton recommended the 7-inch Model 3L RBP to create a temporary isolation barrier that could be safely removed to recommence operations. A service specialist set and tested the RBP successfully without any issues.

2,231

consecutive days of well containment

6 yrs

later RBP is retrieved

0

issues for retrieval on 1st attempt

Results

With the Model 3L RBP providing mechanical isolation, the operator suspended the well as planned. The Model 3L RBP met the operator’s requirement for operational efficiency and reliable recovery, and when operations resumed six years later, Halliburton retrieved the plug on the first attempt with zero issues, helping reduce time to production and maximizing asset value. An inspection showed the tool remained in good condition, with no missing or damaged parts, further demonstrating the plug’s rugged design.

PetroGuard openhole  shunt system
PetroGuard openhole shunt system
icon

Model 3L Retrievable Bridge Plug

Rugged and reliable sealing

Download Data Sheet
icon

FS2 Fluid Loss Isolation Barrier Valve

Reliable, economical fluid control and barrier technology

When the success of your completion project relies on effective flow control and wellbore barriers, the Halliburton FS2 isolation barrier valve provides a reliable, interventionless solution

Download Data Sheet
FS2 fluid loss isolation barrier valve
FS2 fluid loss isolation barrier valve

Related Products

Sand Control

Sand Control

Design and select optimum chemicals, fluid loss control systems, and completion tools for each well.

Explore
FS2 fluid loss isolation barrier valve

FS2 fluid loss isolation barrier valve

The FS2 fluid loss isolation barrier valve is a reliable, interventionless solution for fluid loss control during well completion operations.

Explore
icon

Ready to Take the Next Step?

Talk with a Halliburton Completion Expert

Get in touch