Wellbore service tools combination run saves operator $75,000 USD
Download PDFMature Fields
Complete a single trip operation to prevent debris from falling on the RBP
North Sea
The operator required a temporary suspension between the drilling and completion phase
The Intercept RBP in combination with CleanWell technology
Successful combination run saved $75,000
A major operator in the North Sea wanted a reliable ISO 14310 V0-rated retrievable bridge plug (RBP) to temporarily suspend their well. Additionally, they wanted to displace the well, clean the riser, blowout preventer (BOP), and wellhead in the same run to save valuable rig time.
During the planning of the well (an advanced producer), the operator opted not to drill the reservoir section before suspending the well, which meant the full wellbore cleanup run would not be conducted prior to moving to the next well in the campaign.
The standard operation for the wells on this project had been to complete the required operations over two runs. The first run to set the Intercept retrievable bridge plug, then a subsequent run to perform the clean-up of the riser and BOP sections.
To increase efficiency, the operator turned to Halliburton to come up with a solution that would allow them to install the Intercept RBP, displace the well to packer fluid, clean the riser, BOP, and wellhead in one run. Additionally, they asked Halliburton to develop a solution that would prevent debris from the BOP falling down on the installed Intercept RBP.
Halliburton proposed combining these field-proven technologies to meet the objectives set for the operation:
During the planning phase and prior to running the job, Halliburton conducted internal Critical Well Reviews to capture possible risks with the planned operation. A pre-job meeting was also conducted with all involved personnel prior to the operation. As an additional cost reduction initiative, Halliburton utilized cementing personnel for the installation so that no additional Halliburton personnel were required on location for the operation.
The job was performed as per below:
Pounds of Debris Recovered
Hours of Rig-Time Savings
Saved
The Intercept RBP was set and tested to 5,000 psi. Both wellbore cleaning tools performed successfully with the Riser Mag Tech magnet recovered 10 lbs of debris and the Vali Tech filter catching 84 lbs of debris that otherwise would have dropped on top of the RBP. The operator was very pleased with the customized operation, as Halliburton met all of the objectives set. This was the first time the combination was run globally and the solution saved three hours of rig time, equivalent to $75,000 when compared to performing the same operation with two dedicated runs.
Retrievable Bridge Plugs
Halliburton Intercept® retrievable bridge plug (RBP) is a gas-tight, well-suspension plug ideal for dual-barrier applications, and is designed to handle a wide range of well conditions.
Download Data SheetEnable a wide range of well support operations, save time, and reduce risk with Halliburton retrievable well suspension tools.
Reduce well construction costs with the latest-generation of filtration services, wellbore cleanup fluids, mechanical wellbore cleaning tools, and optimized software modeling.