Automated well testing operations for multiple zones in high-pressure, ultra-high H2S reservoirs removed personnel from the red zone
Download PDFMature Fields
Automate well testing process, while removing personnel from hazardous operation
Middle East
A remotely located exploratory well, characterized by multiple zones, was being drilled in a high-pressure and ultra-high hydrogen sulfide (H2S) environment. Past attempts to flow back these wells proved very challenging, resulting in the client’s heightened expectations of a successful flow back operation.
The local Halliburton Testing and Subsea (TSS) team turned this situation around with the design and execution of a ground-breaking technology solution, addressing the technical, HSE, and emissions aspects of operating in such an extreme environment, while also minimizing crew levels to avoid endangering personnel in the red zone.
Traditionally, when monitoring high-pressure conditions, more equipment is required, and consequently, more personnel are needed to operate the complex well test system. In this case, the operator sought an alternate solution to help mitigate risk to personnel, equipment, and the environment. This not only meant relying on automation to reduce human intervention, but it also involved the maintenance of equipment integrity, reliability, and controllability, with a high degree of accuracy critical to collecting quality test data and gas analysis at surface.
The TSS team responded to these challenges by providing:
The FloConnect products deliver full remote-control functionality that keeps personnel out of the line of fire, with computerized access to equipment status and operational conditions at all times. In addition, provide equipment condition monitoring (ECM) to enable personnel to easily view the choke manifold’s health on screen in real-time.
The client’s goals and expectations of safe test operations were achieved with the introduction of the FloConnect choke manifold, surface data acquisition system, and the gas analyzer system, along with the TSS team’s expertise. In addition, the ECM capability optimized preventative maintenance efforts, leading to 100 percent uptime throughout the whole operation—with zero disruptive events recorded.
Rather than a large crew physically performing tasks and operations in the red zone, a fewer number of personnel remotely executed and monitored everything from the FloConnect Command Center, including the tracking of well parameters and health alerts to prevent equipment failure. Zone-rated FloConnect tablets and helmet-mounted displays assisted the personnel with situational awareness during equipment checks. Finally, hydrocarbon releases into the atmosphere due to disruptive events were eliminated.