Search
Opportunity

Unconventionals

Opportunity
Specific Challenge

Provide an alternative to skip-and-ship process with cuttings reinjection system

REGION - MIDDLE EAST

Middle East

Challenge

  • Reduce costs and environmental risks related to skip-and-ship cuttings management process 

Solution

  • Install BaraCRI™ cuttings reinjection systems at designated injector wellsites, in order to: 
    • Achieve high-capacity disposal 
    • Reduce the number of crane lifts required 
    • Minimize risk for spills or environmental incidents 
    • Supplement CRI operations with skip-and-ship processes on locations where injection is not feasible 

Result

  • Injected over 1.49 million bbl during six-year project 
  • Reduced cuttings disposal costs by more than USD 4 million 
  • Completed project with zero safety or environmental incidents 

Challenge: skip-and-ship process is costly and inefficient

An operator in the Middle East wanted a safe, economical, and environmentally friendly alternative to the skip-and-ship process that would provide reliable cuttings disposal without disrupting drilling or rig operations.

Solution: BaraCRI cuttings reinjection systems optimize cuttings disposal

Baroid personnel visited the field and collected data to conduct the study on the feasibility of installing BaraCRI™ cuttings reinjection (CRI) technology at various injection wellsites in the field. This feasibility study included geomechanical modeling to find out appropriate candidate zones for the injection; hydraulic fracturing simulations to estimate the capacity of the candidate zones, and to check the reliability of barrier zones preventing drilling waste migration; erosion estimation; and specification of surface/subsurface equipment required for safe and continuous CRI operations. Based on the findings of this study, the final plan was prepared and presented to the customer, showing the proposed equipment, installation process, and operational requirements. As an additional safety benefit, the CRI process would significantly reduce crane lifts and associated risks. The operator accepted the plan, which also included a contingency for skip-and-ship operations in areas where the CRI systems were not feasible.

During the six-year project, approximately 1.49 million bbl of cuttings and drilling waste were successfully injected. On the supplemental skip-and-ship sites, an estimated 31,961 MT of skips were handled with zero safety or environmental incidents.

1.49M

bbl of cuttings and waste processed

0

Safety or environmental incidents

4M

USD saved

Result: more than USD 4 million saved in cuttings disposal costs 

The BaraCRI operations eliminated the need for over 10,000 skips during the project, resulting in savings of more than USD 4 million.

This environmentally friendly approach helped prevent spills and reduce risks related to transporting the skips and waste to other disposal locations. 

The project was completed with zero lost-time incidents and zero environmental issues.

Explore related services

Cuttings Reinjection

Cuttings Reinjection

We combine two-stage hammermill processing with advanced slurry rheology design to optimize downhole injection of cuttings.

Explore
icon

ready to take the next step?

Talk with a Halliburton well construction expert

Get in touch