Exceptional professionals collaborating with stakeholders to engineer customized solutions to solve your toughest challenges and produce cost-effective results
Halliburton Project Management has extensive experience in operations, well engineering, and project management. Our professionals have exceptional worldwide oilfield expertise in offshore and land-based well construction, well intervention, and abandonment projects – much of which comes from years of working with oil- and gas-producing companies. We are catalysts who build and lead oilfield teams to achieve results. We ensure that the right people with the right competencies are in the right place at the right time and with the right equipment – ready to do their jobs.
Our exceptional project managers and service coordinators have years of success to provide confidence that your project objectives are achieved and that operations are executed successfully the first time.
Improving performance and reducing costs by increasing efficiency and safety
Halliburton Project Management delivers well construction, well intervention, and abandonment projects on time and within budget through collaborative leadership and risk management. Our teams execute well projects by using defined processes and technology to help you achieve your asset management goals. We improve your performance and reduce costs by increasing efficiency and safety.
We can help you streamline your projects by providing an Integrated Services (IS) coordinator, a turnkey solution through our Integrated Project Management (IPM) service, or a combination of these two services. Our highly experienced IS coordinators can direct a range of services that includes offering a single point of contact for managing logistics, and for providing daily operational leadership and health, safety, and environmental (HSE) management to ensure efficient and cost-effective operations. We can also provide more advanced Integrated Services offerings, such as well construction and intervention planning and supervision, contingency planning, financial tracking, and performance optimization. If you want to outsource the entire project, our Integrated Project Management (IPM) service can help you with a wide range of project integration, including rig sourcing, engineering, regulatory compliance, and project controls. Project management teams integrate our HSE core values into all business activities, striving to proactively manage risks to deliver predictable and economic results.
Halliburton Project Management has extensive relationships and experience with rig contractors, and can help you get the most appropriate rig for your project. Our vast experience in negotiating and managing rig contracts, procurement, third-party contract management, and logistics maximizes your efficiency and reduces costs – by integrating all services, technology, drilling contractors, and third-party providers through a single point of contact for all aspects of planning, design, and execution.
From insight to execution, we collaborate with you to ensure that your project results exceed your expectations.
Delivering success and creating value for our customers through customized well construction and well intervention solutions
Halliburton Project Management has over 1,000 professionals with extensive experience executing a portfolio of more than 50 projects worldwide. From planning to implementation to project delivery, Halliburton Project Management will be your valued partner to achieve asset goals regardless of the complexity of the project.
[{"contenttype":"Case Studies","datasource":[{"title":"Integrated Well Intervention Solution Reduces Offshore P&A Costs By Over 50 Percent","description":"Through close collaboration with the customer, Halliburton took an active part in the development of the overall P&A strategy for the project, analyzing the needs for downhole tool conveyance and focusing on solutions requiring minimum topside equipment. ","path":"/content/dam/ps/public/project_management/contents/Case_Histories/integrated-well-intervention-reduces-offshore-plug-and-abandonment.pdf","docCreatedDate":"2017-12-17T22:30:00.000-06:00","modifiedDate":"2018-03-15T23:30:00.000-05:00","docdate":"2017-12-17T22:30:00.000-06:00","docrefNum":"H012771","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Abandonment,|locations:Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Project_Management:Integrated_Projects:Integrated_Well_Intervention,"},{"title":"Project Management Service Utilizes Technologies to Deliver Wells Ahead of Schedule","description":"An operator utilized Halliburton Project Management (HPM) to increase overall productivity while decreasing the overall risks involved in the development of wells in the Zubair field in Basra, Iraq.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/project-management-service-deliver-wells-ahead-of-schedule-iraq.pdf","docCreatedDate":"2017-06-17T23:30:00.000-05:00","modifiedDate":"2017-11-27T22:30:00.000-06:00","docdate":"2017-06-17T23:30:00.000-05:00","docrefNum":"H012501","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Drill_Bits_&_Services,Baroid,Sperry_Drilling_Services,|locations:Middle_East:Iraq_Middle_East,|prodgroups:Project_Management:Integrated_Projects:Integrated_Well_Construction,Well_Construction,"},{"title":"Integrated Well Intervention Project Successfully Completes First Dual-Annuli Heavy Cement Remediation","description":"In the early 1980s, an operator offshore Brunei had a well drilled and completed with sustained \u201cB\u201d annulus pressure up to","path":"/content/dam/ps/public/project_management/contents/Case_Histories/integrated-well-intervention-successfully-completes.pdf","docCreatedDate":"2019-02-01T13:57:00.000-06:00","modifiedDate":"2019-02-01T14:00:32.509-06:00","docdate":"2019-02-01T13:57:00.000-06:00","docrefNum":"H013106","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Asia:Southeastern_Asia:Brunei_Southeastern_Asia,|prodgroups:Project_Management:Integrated_Service_Levels:Integrated_Project_Management,"},{"title":"SentinelCem™ Cement Cures Losses Successfully in Heavily Fractured Carbonate Formation in Southern Oman","description":"Halliburton Project Management (HPM) was tasked to support Medco Arabia Ltd. in the planning and execution of its Block 56 exploration drilling campaign in southern Oman.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/sentilcem-oman.pdf","docCreatedDate":"2018-04-03T06:23:00.000-05:00","modifiedDate":"2020-04-10T17:47:07.979Z","docdate":"2018-04-03T06:23:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Middle_East:Oman_Middle_East,|prodgroups:Project_Management,"},{"title":"Operator Increases Production by Applying Integrated Services to Well Workover Campaign ","description":"Halliburton recently performed workovers for six wells located in Ecuador\u2019s Armadillo field.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/operator-increases-production-by-applying-integrated-services.pdf","docCreatedDate":"2020-03-25T07:35:00.000-05:00","modifiedDate":"2020-03-25T12:37:41.195Z","docdate":"2020-03-25T07:35:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:South_America:Ecuador_Western_South_America,|prodgroups:Project_Management,"},{"title":"Integrated Drilling and Logging Approach Maximizes Formation Reservoir Exposure ","description":"In the deepwater Gulf of Mexico, Stone Energy planned to drill and log a successful case wellbore into a set of Upper Tertiary (Miocene) target sands in a mature field within Mississippi Canyon Block 28. ","path":"/content/dam/ps/public/project_management/contents/Case_Histories/gom-stone-energy.pdf","docCreatedDate":"2018-04-03T06:32:00.000-05:00","modifiedDate":"2020-04-10T17:47:07.745Z","docdate":"2018-04-03T06:32:00.000-05:00","docrefNum":"H012921","languageSet":["English"],"accessType":"P","dataSearch":"locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Project_Management,"},{"title":"Igapo Achieves Record Drilling Performance with BOREMAX® High-Performance Freshwater Fluid","description":"Customized drilling fluid helps save over three days of rig time in mature field.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/IGAPO-BOREMAX.pdf","docCreatedDate":"2020-11-19T10:44:00.000-06:00","modifiedDate":"2020-11-19T16:44:55.042Z","docdate":"2020-11-19T10:44:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:South_America:Ecuador_Western_South_America,|prodgroups:Project_Management,"},{"title":"Collaborative Integrated Services Solution Saves Time and Cost on Major North Sea P&A Project","description":"UK team completes 13 P&A project $36M under budget and 126 days ahead of schedule.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Integrated-Services-P-A-Project-UK-Continental-Shelf.pdf","docCreatedDate":"2020-12-04T14:16:00.000-06:00","modifiedDate":"2020-12-04T20:18:42.381Z","docdate":"2020-12-04T14:16:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Project_Management,"},{"title":"Multi-PSL Halliburton Team Optimizes Drilling Performance","description":"Drilling efficiencies reduce total project time by 11 days.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Multi-PSL-Team-Optimize-Drilling-Performance-Ecuador.pdf","docCreatedDate":"2020-12-04T14:20:00.000-06:00","modifiedDate":"2020-12-04T20:21:00.580Z","docdate":"2020-12-04T14:20:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:South_America:Ecuador_Western_South_America,|prodgroups:Project_Management,"},{"title":"Halliburton Team Collaborates to Deliver Significant Savings on Operator\u2019s First Local Subsea P&A Project","description":"Halliburton Team Collaborates to Deliver Significant Savings on Operator\u2019s First Local Subsea P&A Project","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Halliburton-Team-Collaborates-to-Deliver-Significant-Savings-on-Operator\u2019s-First-Local-Subsea-PandA-Project.pdf","docCreatedDate":"2020-11-01T13:10:00.000-06:00","modifiedDate":"2021-01-07T19:10:36.839Z","docdate":"2020-11-01T13:10:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Asia:Southeastern_Asia:Malaysia_Southeastern_Asia,|prodgroups:Project_Management,"},{"title":"Integration Drives Performance and Accelerates Learning Curve in an Ultra-Deepwater Pre-Salt Exploration Drilling Project in Brazil","description":"Halliburton Project Management achieves new benchmarks in post-salt and salt sections.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Ultra-Deepwater-Pre-Salt-Brazil.pdf","docCreatedDate":"2020-12-20T17:15:00.000-06:00","modifiedDate":"2020-12-20T23:17:10.642Z","docdate":"2020-12-20T17:15:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Global,|prodgroups:Project_Management,"},{"title":"Halliburton Drills Fastest Directional Well in Napo Basin","description":"Solution optimizes drilling time by 14.75 days.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Well-Construction-Ecuador.pdf","docCreatedDate":"2020-12-20T17:18:00.000-06:00","modifiedDate":"2020-12-20T23:19:15.993Z","docdate":"2020-12-20T17:18:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Project_Management,"},{"title":"Halliburton Team Significantly Increases Production in Challenging HP/HT, High-H2S Field","description":"Mulit-PSL team delivers over 1500,000 BOEPD of additional production in a challenging environment.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/LWIS-HPHT-Kazakhstan.pdf","docCreatedDate":"2020-12-15T13:57:00.000-06:00","modifiedDate":"2020-12-15T19:58:28.988Z","docdate":"2020-12-15T13:57:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Asia:Central_Asia:Kazakhstan_Central_Asia,|prodgroups:Project_Management,"},{"title":"Halliburton East Coast Canada Supports Client to Deliver Significant Savings on Platform P&A Project","description":"Multi-PSL team delivers large P&A project ahead of schedule, saving time and money.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Platform-P-A-Project-Eastern-Canada.pdf","docCreatedDate":"2020-12-21T16:06:00.000-06:00","modifiedDate":"2020-12-21T22:07:19.440Z","docdate":"2020-12-21T16:06:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:North_America:Canada,|prodgroups:Project_Management,"},{"title":"Drilling Optimization in Karim Small Field Saves Drilling Time and Eliminates Wellbore Instability","description":"Improved operational performance results in drilling wells 16 percent faster than planned.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Oman-KSF-Medco.pdf","docCreatedDate":"2020-11-18T13:37:00.000-06:00","modifiedDate":"2020-11-18T19:46:06.581Z","docdate":"2020-11-18T13:37:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Middle_East:Oman_Middle_East,|prodgroups:Project_Management,"},{"title":"Halliburton Delivers Subsea P&A Project in Mature Field","description":"Halliburton was awarded a contract from a well management company to provide P&A services for seven subsea wells in a mature field location in the North Sea. ","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Subsea-P-A-Project-North-Sea.pdf","docCreatedDate":"2020-07-22T13:34:00.000-05:00","modifiedDate":"2020-07-22T18:37:11.691Z","docdate":"2020-07-22T13:34:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Project_Management,"},{"title":"Integration Drives Performance and Accelerates Learning Curve in an Ultra-Deepwater Pre-Salt Exploration Drilling Project in Brazil","description":"In Brazil, the Halliburton Integrated Services (IS) technical team is continuously collaborating to optimize well construction and evaluation services in a giant pre-salt field for a major consortium. ","path":"/content/dam/ps/public/project_management/contents/Case_Histories/libra.pdf","docCreatedDate":"2018-03-05T06:30:00.000-06:00","modifiedDate":"2021-01-19T13:40:44.526Z","docdate":"2018-03-05T06:30:00.000-06:00","docrefNum":"H012887","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:South_America:Brazil_Eastern_South_America,|prodgroups:Completion_Equipment_and_Services:Packers:Permanent-Production_Packers,Project_Management,"},{"title":"Well Construction Drilling Record","description":"A client turned to Halliburton to perform their 2016-2017drilling campaign in order to maintain production in theNapo Basin of Ecuador.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/well-construction-drilling-record.pdf","docCreatedDate":"2018-03-15T23:30:00.000-05:00","modifiedDate":"2018-03-15T23:30:00.000-05:00","docdate":"2018-03-15T23:30:00.000-05:00","docrefNum":"H012878","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:South_America:Ecuador_Western_South_America,|prodgroups:Project_Management,"},{"title":"In 1924, Myron Kinley Kick-Starts the Well Control Industry with a Bang","description":"Most well control methods and technologies usedtoday trace their roots back to one man: Myron Kinley","path":"/content/dam/ps/public/project_management/contents/Case_Histories/myron-kinley-kick-starts-well-control.pdf","docCreatedDate":"2018-06-01T23:30:00.000-05:00","modifiedDate":"2018-07-11T23:30:00.000-05:00","docdate":"2018-06-01T23:30:00.000-05:00","docrefNum":"H012526","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Pressure_Control:Well_Control,Project_Management,"},{"title":"Halliburton Project Management Exceeds Performance Goals on First IDS Project for Operator in Malaysia","description":"Project team implements high-efficiency strategies to ensure success of complex infill gas wells.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/IDS-Project-Malaysia.pdf","docCreatedDate":"2020-12-10T15:35:00.000-06:00","modifiedDate":"2020-12-10T21:36:09.419Z","docdate":"2020-12-10T15:35:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Asia:Southeastern_Asia:Malaysia_Southeastern_Asia,|prodgroups:Project_Management,"}]},{"contenttype":"External News Articles","datasource":[{"title":"Investors' Voice - April 2020 - Halliburton Integrated Well Intervention - The Key to Maximizing Asset Value","description":"The Halliburton RELAY™ digital slickline system\u2019s real-time depth correlation and on-command triggering allow E&P operators to complete well work, using a smaller unit with fewer rig ups to maximize efficiency. ","path":"/content/dam/ps/public/project_management/contents/Papers_and_Articles/iwi-Caspian.pdf","docCreatedDate":"2020-05-28T11:41:00.000-05:00","modifiedDate":"2020-04-10T16:01:01.307Z","docdate":"2020-05-28T11:41:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Project_Management,"}]},{"contenttype":"centerColList","datasource":[{"title":"Integrated Well Intervention Solution Reduces Offshore P&A Costs By Over 50 Percent","description":"Through close collaboration with the customer, Halliburton took an active part in the development of the overall P&A strategy for the project, analyzing the needs for downhole tool conveyance and focusing on solutions requiring minimum topside equipment. ","path":"/content/dam/ps/public/project_management/contents/Case_Histories/integrated-well-intervention-reduces-offshore-plug-and-abandonment.pdf","docCreatedDate":"2017-12-17T22:30:00.000-06:00","modifiedDate":"2018-03-15T23:30:00.000-05:00","docdate":"2017-12-17T22:30:00.000-06:00","docrefNum":"H012771","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Abandonment,|locations:Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Project_Management:Integrated_Projects:Integrated_Well_Intervention,"},{"title":"Project Management Service Utilizes Technologies to Deliver Wells Ahead of Schedule","description":"An operator utilized Halliburton Project Management (HPM) to increase overall productivity while decreasing the overall risks involved in the development of wells in the Zubair field in Basra, Iraq.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/project-management-service-deliver-wells-ahead-of-schedule-iraq.pdf","docCreatedDate":"2017-06-17T23:30:00.000-05:00","modifiedDate":"2017-11-27T22:30:00.000-06:00","docdate":"2017-06-17T23:30:00.000-05:00","docrefNum":"H012501","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Drill_Bits_&_Services,Baroid,Sperry_Drilling_Services,|locations:Middle_East:Iraq_Middle_East,|prodgroups:Project_Management:Integrated_Projects:Integrated_Well_Construction,Well_Construction,"},{"title":"Integrated Well Intervention Project Successfully Completes First Dual-Annuli Heavy Cement Remediation","description":"In the early 1980s, an operator offshore Brunei had a well drilled and completed with sustained \u201cB\u201d annulus pressure up to","path":"/content/dam/ps/public/project_management/contents/Case_Histories/integrated-well-intervention-successfully-completes.pdf","docCreatedDate":"2019-02-01T13:57:00.000-06:00","modifiedDate":"2019-02-01T14:00:32.509-06:00","docdate":"2019-02-01T13:57:00.000-06:00","docrefNum":"H013106","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Asia:Southeastern_Asia:Brunei_Southeastern_Asia,|prodgroups:Project_Management:Integrated_Service_Levels:Integrated_Project_Management,"},{"title":"SentinelCem™ Cement Cures Losses Successfully in Heavily Fractured Carbonate Formation in Southern Oman","description":"Halliburton Project Management (HPM) was tasked to support Medco Arabia Ltd. in the planning and execution of its Block 56 exploration drilling campaign in southern Oman.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/sentilcem-oman.pdf","docCreatedDate":"2018-04-03T06:23:00.000-05:00","modifiedDate":"2020-04-10T17:47:07.979Z","docdate":"2018-04-03T06:23:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Middle_East:Oman_Middle_East,|prodgroups:Project_Management,"},{"title":"Operator Increases Production by Applying Integrated Services to Well Workover Campaign ","description":"Halliburton recently performed workovers for six wells located in Ecuador\u2019s Armadillo field.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/operator-increases-production-by-applying-integrated-services.pdf","docCreatedDate":"2020-03-25T07:35:00.000-05:00","modifiedDate":"2020-03-25T12:37:41.195Z","docdate":"2020-03-25T07:35:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:South_America:Ecuador_Western_South_America,|prodgroups:Project_Management,"},{"title":"Integrated Drilling and Logging Approach Maximizes Formation Reservoir Exposure ","description":"In the deepwater Gulf of Mexico, Stone Energy planned to drill and log a successful case wellbore into a set of Upper Tertiary (Miocene) target sands in a mature field within Mississippi Canyon Block 28. ","path":"/content/dam/ps/public/project_management/contents/Case_Histories/gom-stone-energy.pdf","docCreatedDate":"2018-04-03T06:32:00.000-05:00","modifiedDate":"2020-04-10T17:47:07.745Z","docdate":"2018-04-03T06:32:00.000-05:00","docrefNum":"H012921","languageSet":["English"],"accessType":"P","dataSearch":"locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Project_Management,"},{"title":"Igapo Achieves Record Drilling Performance with BOREMAX® High-Performance Freshwater Fluid","description":"Customized drilling fluid helps save over three days of rig time in mature field.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/IGAPO-BOREMAX.pdf","docCreatedDate":"2020-11-19T10:44:00.000-06:00","modifiedDate":"2020-11-19T16:44:55.042Z","docdate":"2020-11-19T10:44:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:South_America:Ecuador_Western_South_America,|prodgroups:Project_Management,"},{"title":"Collaborative Integrated Services Solution Saves Time and Cost on Major North Sea P&A Project","description":"UK team completes 13 P&A project $36M under budget and 126 days ahead of schedule.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Integrated-Services-P-A-Project-UK-Continental-Shelf.pdf","docCreatedDate":"2020-12-04T14:16:00.000-06:00","modifiedDate":"2020-12-04T20:18:42.381Z","docdate":"2020-12-04T14:16:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Project_Management,"},{"title":"Multi-PSL Halliburton Team Optimizes Drilling Performance","description":"Drilling efficiencies reduce total project time by 11 days.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Multi-PSL-Team-Optimize-Drilling-Performance-Ecuador.pdf","docCreatedDate":"2020-12-04T14:20:00.000-06:00","modifiedDate":"2020-12-04T20:21:00.580Z","docdate":"2020-12-04T14:20:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:South_America:Ecuador_Western_South_America,|prodgroups:Project_Management,"},{"title":"Halliburton Team Collaborates to Deliver Significant Savings on Operator\u2019s First Local Subsea P&A Project","description":"Halliburton Team Collaborates to Deliver Significant Savings on Operator\u2019s First Local Subsea P&A Project","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Halliburton-Team-Collaborates-to-Deliver-Significant-Savings-on-Operator\u2019s-First-Local-Subsea-PandA-Project.pdf","docCreatedDate":"2020-11-01T13:10:00.000-06:00","modifiedDate":"2021-01-07T19:10:36.839Z","docdate":"2020-11-01T13:10:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Asia:Southeastern_Asia:Malaysia_Southeastern_Asia,|prodgroups:Project_Management,"},{"title":"Integration Drives Performance and Accelerates Learning Curve in an Ultra-Deepwater Pre-Salt Exploration Drilling Project in Brazil","description":"Halliburton Project Management achieves new benchmarks in post-salt and salt sections.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Ultra-Deepwater-Pre-Salt-Brazil.pdf","docCreatedDate":"2020-12-20T17:15:00.000-06:00","modifiedDate":"2020-12-20T23:17:10.642Z","docdate":"2020-12-20T17:15:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Global,|prodgroups:Project_Management,"},{"title":"Halliburton Drills Fastest Directional Well in Napo Basin","description":"Solution optimizes drilling time by 14.75 days.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Well-Construction-Ecuador.pdf","docCreatedDate":"2020-12-20T17:18:00.000-06:00","modifiedDate":"2020-12-20T23:19:15.993Z","docdate":"2020-12-20T17:18:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Project_Management,"},{"title":"Halliburton Team Significantly Increases Production in Challenging HP/HT, High-H2S Field","description":"Mulit-PSL team delivers over 1500,000 BOEPD of additional production in a challenging environment.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/LWIS-HPHT-Kazakhstan.pdf","docCreatedDate":"2020-12-15T13:57:00.000-06:00","modifiedDate":"2020-12-15T19:58:28.988Z","docdate":"2020-12-15T13:57:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Asia:Central_Asia:Kazakhstan_Central_Asia,|prodgroups:Project_Management,"},{"title":"Halliburton East Coast Canada Supports Client to Deliver Significant Savings on Platform P&A Project","description":"Multi-PSL team delivers large P&A project ahead of schedule, saving time and money.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Platform-P-A-Project-Eastern-Canada.pdf","docCreatedDate":"2020-12-21T16:06:00.000-06:00","modifiedDate":"2020-12-21T22:07:19.440Z","docdate":"2020-12-21T16:06:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:North_America:Canada,|prodgroups:Project_Management,"},{"title":"Drilling Optimization in Karim Small Field Saves Drilling Time and Eliminates Wellbore Instability","description":"Improved operational performance results in drilling wells 16 percent faster than planned.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Oman-KSF-Medco.pdf","docCreatedDate":"2020-11-18T13:37:00.000-06:00","modifiedDate":"2020-11-18T19:46:06.581Z","docdate":"2020-11-18T13:37:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Middle_East:Oman_Middle_East,|prodgroups:Project_Management,"},{"title":"Halliburton Delivers Subsea P&A Project in Mature Field","description":"Halliburton was awarded a contract from a well management company to provide P&A services for seven subsea wells in a mature field location in the North Sea. ","path":"/content/dam/ps/public/project_management/contents/Case_Histories/Subsea-P-A-Project-North-Sea.pdf","docCreatedDate":"2020-07-22T13:34:00.000-05:00","modifiedDate":"2020-07-22T18:37:11.691Z","docdate":"2020-07-22T13:34:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Project_Management,"},{"title":"Integration Drives Performance and Accelerates Learning Curve in an Ultra-Deepwater Pre-Salt Exploration Drilling Project in Brazil","description":"In Brazil, the Halliburton Integrated Services (IS) technical team is continuously collaborating to optimize well construction and evaluation services in a giant pre-salt field for a major consortium. ","path":"/content/dam/ps/public/project_management/contents/Case_Histories/libra.pdf","docCreatedDate":"2018-03-05T06:30:00.000-06:00","modifiedDate":"2021-01-19T13:40:44.526Z","docdate":"2018-03-05T06:30:00.000-06:00","docrefNum":"H012887","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:South_America:Brazil_Eastern_South_America,|prodgroups:Completion_Equipment_and_Services:Packers:Permanent-Production_Packers,Project_Management,"},{"title":"Well Construction Drilling Record","description":"A client turned to Halliburton to perform their 2016-2017drilling campaign in order to maintain production in theNapo Basin of Ecuador.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/well-construction-drilling-record.pdf","docCreatedDate":"2018-03-15T23:30:00.000-05:00","modifiedDate":"2018-03-15T23:30:00.000-05:00","docdate":"2018-03-15T23:30:00.000-05:00","docrefNum":"H012878","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:South_America:Ecuador_Western_South_America,|prodgroups:Project_Management,"},{"title":"In 1924, Myron Kinley Kick-Starts the Well Control Industry with a Bang","description":"Most well control methods and technologies usedtoday trace their roots back to one man: Myron Kinley","path":"/content/dam/ps/public/project_management/contents/Case_Histories/myron-kinley-kick-starts-well-control.pdf","docCreatedDate":"2018-06-01T23:30:00.000-05:00","modifiedDate":"2018-07-11T23:30:00.000-05:00","docdate":"2018-06-01T23:30:00.000-05:00","docrefNum":"H012526","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Pressure_Control:Well_Control,Project_Management,"},{"title":"Halliburton Project Management Exceeds Performance Goals on First IDS Project for Operator in Malaysia","description":"Project team implements high-efficiency strategies to ensure success of complex infill gas wells.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/IDS-Project-Malaysia.pdf","docCreatedDate":"2020-12-10T15:35:00.000-06:00","modifiedDate":"2020-12-10T21:36:09.419Z","docdate":"2020-12-10T15:35:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Asia:Southeastern_Asia:Malaysia_Southeastern_Asia,|prodgroups:Project_Management,"}]}]