Search
New IntelliTTCE™ service provides early well insight for offshore plug and abandonment planning

New IntelliTTCE™ service provides early well insight for offshore plug and abandonment planning

HOUSTON – Nov. 11, 2026 – Halliburton today announced the IntelliTTCE™ service, a through-tubing cement evaluation service that helps operators verify zonal isolation before plug and abandonment (P&A) operations. The service verifies barrier integrity before abandonment, helping operators avoid unnecessary tubing retrieval and plan P&A campaigns around real well conditions.

Conventional cement evaluation workflows often require tubing removal and rig mobilization before operators fully understand cement condition and well integrity. As a result, critical well information may not be available during the early stages of P&A planning. IntelliTTCE service helps address this challenge by evaluating cement through tubing and providing diagnostic information before resource mobilization. 

Reliable well data early in project planning helps operators define intervention strategies with greater certainty. IntelliTTCE service brings that evaluation to the front end of the process and helps customers make better decisions around actual well conditions rather than preliminary assumptions.”

Chris Tevis, vice president, Wireline and Perforating, Halliburton

The service combines dual independent deterministic evaluation methods and high-resolution azimuthal cement mapping to characterize cement conditions behind pipe. Designed for offshore P&A applications, its physics-based through-tubing evaluation approach delivers consistent, repeatable diagnostic results.

IntelliTTCE service helps operators move from contingency-based planning to planning based on actual well conditions. The resulting evaluation helps operators define the scope and sequence of subsequent P&A intervention activities with greater confidence in well conditions before key planning decisions are made.

About Halliburton

Halliburton is one of the world's leading providers of products and services to the energy industry. Founded in 1919, we create innovative technologies, products, and services that help our customers maximize their value throughout the life cycle of an asset and advance a sustainable energy future. Connect with us on LinkedIn, YouTube, Instagram, and Facebook.

For Investors:
David Coleman
investors@halliburton.com
281-871-2688

For Media Relations:
Alexandra Franceschi
PR@halliburton.com
281-871-3602

Explore featured services & solutions

IntelliTTCE™ service

IntelliTTCE™ service

Evaluate cement and verify zonal isolation through tubing before intervention to reduce uncertainty, improve planning, and lower total abandonment cost

Explore
Wireline cased hole logging

Wireline cased hole logging

Halliburton cased hole logging tools give operators the measurements to optimize reservoir performance and evaluate well integrity.

Explore
Plug and abandonment tools

Plug and abandonment tools

Halliburton provides the technology and expertise to facilitate safe and efficient operations worldwide for Plug & Abandonment solutions.

Explore
icon

Ready to take the next step?

Talk to a Halliburton expert

Get in touch