Search
Opportunity

Unconventionals

Opportunity
Specific Challenge

Optimize drilling operations in an abrasive formation

REGION - OMAN REGION - OMAN

Amin Formation, Oman

REGION - OMAN

Challenge

  • Optimize vertical drilling operations in an abrasive formation by: 
    • Reducing bit runs to reduce cost 
    • Maintaining verticality with a high-torque, low-speed-motor BHA 
    • Replacing costly vertical drilling system with a more economical solution

Solution

  • Replace vertical drilling systems with GeoForce® enhanced performance motor to increase torque, motor life, and bit life 
  • Utilize MaxBHA™ software in combination with MWD to improve drilling performance and stabilization through real-time modeling

Result

  • GeoForce motor enabled operator to drill 9,062 feet (2,762 meters) in just one run, setting a new field record 
  • Maintained well verticality with only 11.5 feet (3.5 meters) displacement at the section TD

Overview

An operator in Oman had been using two different bottomhole assemblies (BHAs) to drill a 12-1/4-inch vertical section for unconventional wells. The first BHA contained a conventional vertical drilling system (VDS) to drill to the top of the abrasive and conglomerate Amin formation. As the VDS did not have enough torque to drill through the remainder of the Amin formation, which was very hard, the operator was forced to trip out of the hole to change to a high-torque, low-speed-motor BHA to drill through the last section until total depth (TD). With a conventional drilling solution, the operator typically drilled these sections in an average of 31 days and five bit runs. To improve drilling efficiency and reduce costs, the operator sought a new BHA design and service for this vertical section.

Challenge: operator seeks new way to efficiently drill vertical section in abrasive formation

Hard and abrasive formations can cause issues for operators, such as high vibration and low rate of penetration (ROP). An optimal solution would include a BHA with sufficient rotations per minute (RPM) and horsepower to maintain adequate ROP, eliminating extra days and bit trips. With similar problematic drilling issues in the Amin formation, the operator in Oman needed to drill at a low speed with high torque to withstand the vibrations, while improving drilling efficiency to save costs of rig time.;

Solution: GeoForce® motor improves efficiency with vertical drilling solution

The Sperry Drilling team chose a 9-5/8-inch GeoForce® enhanced performance motor, while also utilizing MaxBHA™ design software to determine optimal stabilizer placement and a polycrystalline diamond compact (PDC) bit to increase drilling reliability and performance in this vertical section of the well. The Sperry Drilling team also recommended using measurement-while-drilling (MWD) services that provided directional surveys to determine the wellpath and to maintain the hole verticality while drilling.

Compared with conventional mud motor or VDS assemblies, the GeoForce motor provides more consistent torque applied to the bit – thus increasing ROP, motor life, and bit life. The Sperry Drilling experts utilized MaxBHA software to perform BHA modeling to determine the optimal stabilizer placements for reducing vibration, which improved the steerability while reducing wear and tear of internal motor components. The combination of customized adjustable-bend housings and even-layer stator motors that incorporate a special invert-compatible hard elastomer provides consistent power to the bit while withstanding high differential pressures, improving longer bit runs, and reducing the number of bit trips, especially in abrasive environments.

7.5

Day Drilling-Time Reduction

14

Days of No-Issue Drilling

9,062

Feet Drilled in One Run

Result: use of GeoForce motor in vertical drilling solution sets new field record 

The GeoForce motor enabled the operator to drill 9,062 feet (2,762 meters) in one run – drilling with no issues for 14 days and setting a new field record. The operator was able to increase RPM and weight on bit (WOB), eliminating three runs and reducing drilling time by 7.5 days. In addition, the operator drilled the well within vertical section tolerance with only 11.5 feet (3.5 meters) displacement at the section TD.

GeoForce motors demonstrated superior performances in wells XXX-32 and XXX-33 compared to other offset wells drilled with two BHAs that consisted of a VDS and then a motor.

Related services

Drilling Motors

Drilling Motors

Halliburton Sperry Drilling motors ensure faster drilling, reduced well time, and more accurate well placement in any basin application.

Explore
Drilling