Opportunity
Specific challenge

Required long-term barrier integrity

Region Region

Canada

Region

Challenge

  • Required long-term barrier integrity
  • Faced extended depth and high deviation
  • Needed proven technology for reliability

Solution

  • Conducted metallurgy and elastomer compatibility review
  • Analyzed temperature, pressure, and fluid composition
  • Engineered for mechanical integrity and sealing reliability

Result

  • Delivered six years of dependable isolation
  • Recovered RBP without operational issues
  • Enabled inspection and reuse for future operations

Overview

An operator in East Canada faced an unexpected need for a dependable, long-term downhole barrier. Unlike typical short-term barriers used for maintenance, this application required extended reliability to isolate a lower production interval and prevent water ingress. Halliburton provided the 7-in. EV0-Trieve™ retrievable bridge plug (RBP), which delivered exceptional performance for nearly six years and enabled a seamless recovery process. 

Challenge

The operator required a solution that maintained barrier integrity for years rather than weeks. The well’s extended depth of 5745 m measured depth (MD) and 37° deviation added complexity. The operator required technology with proven reliability and compatibility with harsh downhole conditions. 

Solution

Halliburton collaborated with the operator to conduct a comprehensive technical assessment. The team reviewed metallurgy and elastomer compatibility, analyzed temperature and pressure, and evaluated deviation factors. Halliburton and the customer selected the 7-in. EV0-Trieve™ RBP to ensure mechanical integrity and sealing reliability throughout the extended deployment. Halliburton assessed fluid composition and downhole parameters to optimize material selection and to help ensure long-term performance. 

 

 

6

Years of long-term downhole barrier performance

10+

Years of field-proven success

40+

EV0-Trieve RBPs deployed in Newfoundland

ERD

Wells to depth of 8,450 m MD

Result

The EV0-Trieve™ RBP delivered six years of uninterrupted barrier performance and was recovered without operational complications. The successful recovery allowed inspection and redress for future use, reducing cost and downtime. With more than 40 deployments in offshore Newfoundland alone, the EV0-Trieve™ system continues to prove its value as a trusted solution for operators who seek dependable barrier integrity and operational efficiency in complex well environments. 

Related products

Thru-tubing intervention tools

Thru-tubing intervention tools

Customizable intervention solutions for wellbore remediation reduce well time and costs.

Explore
icon

Ready to take the next step?

Talk with a Halliburton completion tools expert

Get in touch