Reducing days on location and time to first oil

Operators are always looking for new ways to gain efficiencies at the surface. Halliburton simul-frac operations help you stimulate more stages across multiple wells at the same time, using a single fleet. 

During simul-frac operations, efficiencies are amplified to significantly reduce days on location by maximizing gains in lateral footage, as well as gains in savings – allowing you to realize first oil faster, while making a significant return on your investment.  

efficiency gains

More stages, less time

Operators are always looking for new ways to gain efficiencies at the surface. Halliburton simul-frac operations help you stimulate more stages across multiple wells at the same time, using a single fleet.  

  • AVERAGING 160 BPM  
  • STIMULATING 3,600 FEET/DAY  
  • PUMPING 450+ HOURS/MONTH  
  • COMPLETING 50% MORE STAGES/MONTH  
  • REDUCING DAYS ON LOCATION BY 50%

Eliminate idle time

When zipper-fracturing a four-well pad, two wells are being stimulated while the other two sit idle. Simul-frac operations eliminate this idle time by making forward progress across all four wells.  

With simul-frac operations, you are pumping down two wells, while perforating the other two, allowing you to complete more lateral footage in the same amount of time compared to current zipper-frac operations. 

Achieve peak performance with endurance and horsepower 

When pumping 160 barrels per minute and hundreds of stages per month, it takes experience and endurance to consistently achieve peak performance – and not all fleets are created equal. From our ruggedized Q10-X™ pump designed for shale fracturing, to the ExpressKinect® manifold that offers a single-pump connection, the Halliburton fleet maximizes efficiency and safety across simul-frac operations. 