Overview

Halliburton was working with a major operator in Norway on its drilling operations in a mature field in the North Sea. While discussing upcoming well challenges with the customer, Halliburton recognized an opportunity to introduce the newly released Intercept retrievable bridge plug, which would offer the customer a gas-tight V0 barrier during batch drilling and completions.

Two jobs were successfully completed with no issues or non-productive time (NPT), solving the customer’s challenge to have V0 barriers in place while temporarily abandoning the wells.

Challenge

This operator needed to rent barrier plugs in order to temporarily abandon its wells to drill and run batch completions. Normally, the operator rented bridge plugs from another service company. Halliburton had to convince the operator that the Intercept retrievable bridge plug would lower risks and save time since it did not require left-hand rotations and hang-weight below to operate down hole.

Solutions

Halliburton provided specific tool data as it related to the well conditions, sizing, and temperatures in order to help ensure that the Intercept retrievable bridge plug would perform well in the environment. Halliburton also explained that the plug is versatile since it does not require hang-weight below to set, which saves rig time. Should well operations require it, however, the plug can handle significant pipe weight below, saving trip time and reducing cost. Since the plug does not require left-hand rotation, it reduces the risk of accidental disconnection of the workstring or workstring components.
 
A Global Critical Well Review for these specific jobs was executed in order to prove Halliburton commitment to the operation.
V0

barrier during batch drilling and completions

2

batch wells

0

NPT

Results

One 9 5/8-in. Intercept bridge plug was installed in Well No. 1 to cover the shallow barrier. Two 9 5/8-in. Intercept bridge plugs were installed in Well No. 2 in order to cover the deep and shallow barriers. All three Intercept bridge plugs were installed successfully, incurring zero NPT. The operator was pleased with the service and performance of the Intercept retrievable bride plug and has continued to use these plugs in three other wells.

 

Intercept Retrievable Bridge Plug

A gas-tight, well-suspension plug ideal for dual-barrier applications, and is designed to handle a wide range of well conditions

Download Data Sheet
Intercept Retrievable Bridge Plug
Intercept Retrievable Bridge Plug
icon

Ready to Take the Next Step

Talk with a Halliburton Completion Expert

Contact Us