Search

Packer Fluids

Expertly formulated Baroid packer fluids limit production tubing and production casing corrosion while extending these components’ life and reducing costs over the well’s lifetime. They also eliminate differential pressure across the packer to avoid reaching collapse pressure and extend the reliability and life of the packer. 

Control heat flow, increase well productivity

Uncontrolled heat transfer from production tubing to outer annuli and the loss of heat energy from produced fluids are challenges in deepwater production design. These conditions can damage outer well annuli integrity and reduce well productivity. We specially formulate our Baroid insulating packer fluids to provide control over heat flow from production tubing to the outer annuli, reducing annular pressure buildup and maintaining flowing well temperatures.

icon

Ready to take the next step?

Talk to a Halliburton expert

Get in touch