Seneca boosts efficiency with RapidStage® ME sleeves
Seneca boosts ERL efficiency using RapidStage® ME sleeves, cutting cycle time, reducing costs, and eliminating drill outs in challenging completions
Article
Operator to use 100% produced water for frac operations
Halliburton’s AcroClear® enables safe, uninterrupted frac operations by eliminating H₂S and FeS from produced water in West Texas using continuous treatment
Case Study
Ultrasonic Images Identify Breakout and Bed Boundaries
PixStar™ ultrasonic imaging identifies bed boundaries and borehole breakout in high-angle wells, improving wellbore stability and reservoir understanding
Case Study
Multilateral installations: paying dividends for two decades
Over 300 FlexRite multilateral system junctions have been installed in North Sea deepwater wells since 2001, evolving from dual-laterals to tri-lateral completions.
Article
VersaFlex® XSL Expandable Liner Hanger System
The VersaFlex XSL expandable liner hanger (ELH) system delivers low-to-moderate load-bearing without sacrificing its gas-tight sealing capability
Case Study
RapidStage system with AccessFrac service in the Bakken
RapidStage system using Swellpacker isolation system - two discrete fracture treatments in a stage can be achieved by introducing AccessFrac in Williston Basin.
Case Study
Norway: Intercept® RBP retrieved after 9 months in wellbore
Halliburton had been delivering Intercept® retrievable bridge plugs (RBPs) on a regular basis to a major operator in the North Sea, providing gas-tight barrier.
Case Study
Operator saves USD 450,000 in abrasive high-temperature well
Operator saves usd 450k in abrasive, high-temperature well turbopower turbodrill with diamond impregnated bits doubles ROP and accelerates production schedules.
Case Study
Securing well for 6 years using retrievable service tools
Halliburton's 7-inch model 3L™ retrievable bridge plug provides reliable well suspension barrier preventing uncontained formation fluids release in Middle East.