Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Acoustic evaluation of cement integrity saves rig time costs

The Halliburton CAST-M™/RBT-M tool combination enabled a faster and more-confident cement evaluation to save an operator in Egypt $100,000 in rig time costs.

Case Study

2M USD and 48 hours saved from RSS and At-Bit Reamer

Discover how Halliburton's engineered drilling solution, Geo-Pilot® Dirigo™ RSS with TD Ream® Tool, eliminates extra rathole run in the Gulf of Mexico.

Case Study

Petroindependencia drills longest ERD well in target zone

Geo-Pilot Dirigo RSS reduces well time by three days in an extended-reach well by drilling field’s longest lateral in 3 days while staying in the sweet spot.

Case Study

Operator saves USD 3.4 million in presalt drilling

Comprehensive drilling solution includes the following: front planning and modeling, real-time monitoring, and the Geo-Pilot Duro RSS with advanced features.

Case Study

Operator saves with Geo-Pilot® XL RSS and underreamer

$500,000 USD and 61 hours saved using Geo-Pilot xl rss combined with underreamer engineered solution in a heterogenus formation to reduce the well time.

Case Study

FightR™ LXD friction reducer helps improve performance

FIGHTR™ chemistry achieves superior performance at lower doses, enhancing well treatment efficiency and reducing operational costs in complex conditions

Brochure

Vibration monitoring and mitigation guidlines - brochure

Vibration monitoring and mitigation delivers value by reducing drilling trouble time, optimizing drilling practices, and improving overall drilling perform.

Data Sheet

Targeted Annular Perforating (TAP) Data Sheet

The Targeted Annular Perforating (TAP) approach provides a custom perforating solution for unique plug and abandonment (P&A) projects

Article

LithoFact® NGS Natural Gamma Ray Spectrometry - Data Sheet

Case Study

Record-setting lateral completion with Obsidian Plugs

Discover how Halliburton and eclipse resources set 124 frac plugs averaging roughly 5.3 frac stages per day in Eclipse Purple Hayes 1H Well, Utica Shale.

Results per page: 102550