Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

BaraKlean - Data sheet

Surfactant solution used for surface cleaning applications. Used to remove water and oil-based mud residues from pits, tanks, circulating lines and manifolds

Case Study

BaraECD non-aqueous fluid system helps customer reach reservoir

BaraECD system achieves operator's objectives and extends access to additional areas of reservoir, allowing for more directional drilling

Data Sheet

Otis® R® and RN® landing nipples & lock mandrels - Data sheet

Otis R® landing nipples are selective by running tool and are run on the completion tubing to provide landing locations for subsurface flow control equipment.

Data Sheet

DuraSleeve® Sliding Side-Door® circulation and production sleeve - Data sheet

Full opening device with an inner sleeve that can be repeatedly opened and closed to gain communication between the tubing/casing annulus.

Case Study

eMotion®-LV barrier valve saves 29 hours of rig time

Unfold how Halliburton's completion tools successfully eliminate interventions during packer-setting operations with eMotion-LV barrier, valve saving rig time.

Case Study

Integrated well intervention vessel in Malaysia

Discover how Halliburton's Integrated Well Intervention Vessel (IWIV) slashes gravel-packing time in Malaysia, saving the operator an estimated USD 300K.

Data Sheet

LiquiLite™ Cement Additive

Simplified offshore operations by eliminating bulk blending, reducing costs, and customizing slurry density.

Case Study

Halliburton helps determine fracture height for Tecpetrol SA

Halliburton's RMT-I™ pulsed-neutron tool accurately helped assess unconventional reservoir gas productivity for Tecpetrol SA in Neuquén Basin, Argentina.

Case Study

Illusion® frac plug helps provide optimum zonal isolation

Operator from Deleware gains over $51 million USD in production as a result of implementing the Illusion® Frac Plug to work on optimal zonal isolation.

Case Study

Offshore rigless wireline intervention solution adds 4,000 BOPD with zero water production

Efficient rigless wireline intervention revives offshore Egypt well production, adding 4,000 BOPD and zero water production.

Results per page: 102550