Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

BaraECD fluid and WellSET treatment strengthen wellbore

Discover how BaraECD® fluid system and WellSet® wellbore strengthening treatment solve deepwater subsalt drilling challenges, saving significant time and money.

Case Study

Geo-Pilot® XL saves 61 hours and USD $500,000

Halliburton's Geo-Pilot XL RSS and underreamer solution reduces well time in a difficult, heterogeneous formation for an operator in offshore Indonesia.

Case Study

PetroGuard openhole shunt system ensures gravel-pack success

Halliburton's PetroGuard openhole shunt system in Myanmar ensures a gravel-pack success for the TOTAL's 4 well batch completion in the production's efficency.

Case Study

Custom chemistry improves production in Permian Basin region

In the Permian region, Halliburton worked with a Midland Basin operator to improve production with only minor changes to the fracture design and operations.

Data Sheet

BaraMesh® shale shaker screens - Data sheet

BaraMesh screens incorporate a larger wire diameter than conventional shaker screens, offering more resistance to wear and helping increase screen life

Data Sheet

DuraSleeve® Sliding Side-Door® circulation and production sleeve - Data sheet

Full opening device with an inner sleeve that can be repeatedly opened and closed to gain communication between the tubing/casing annulus.

Data Sheet

BaraKlean - Data sheet

Surfactant solution used for surface cleaning applications. Used to remove water and oil-based mud residues from pits, tanks, circulating lines and manifolds

Case Study

BaraECD non-aqueous fluid system helps customer reach reservoir

BaraECD system achieves operator's objectives and extends access to additional areas of reservoir, allowing for more directional drilling

Data Sheet

Otis® R® and RN® landing nipples & lock mandrels

Otis R® landing nipples are selective by running tool and are run in the well on the completion tubing to provide a specific landing location for subsurface flow control equipment.

Case Study

eMotion®-LV barrier valve saves 29 hours of rig time

Unfold how Halliburton's completion tools successfully eliminate interventions during packer-setting operations with eMotion-LV barrier, valve saving rig time.

Results per page: 102550