Complex wireline job executed safely and efficiently
Download PDFMature Fields
Isolate a water-producing zone in a rigless highly-deviated offshore well
Gulf of Suez, Red Sea, Egypt
An offshore Egypt operator, whose highly deviated well was challenged by a sour environment, high water production, and high bottomhole temperature, required a wireline operator that could perform a rigless intervention to bring the well back on production. Halliburton met the challenge through close customer collaboration, thorough job preplanning, efficient wellsite execution, and attention to safety.
A major oil company in the Gulf of Suez needed to isolate a water-producing zone based on surface well test data, which confirmed that the oil-water contact (OWC) had moved up in a rigless offshore well. Additionally, a new formation needed to be put on production with a new set of perforations based on the field data. The highly deviated (+68°) well was located in a mature field with a highly sour environment (+300 PPM H2S, 1.5% CO2) and high bottomhole temperature (+320°F). Further complicating the operation was a gas-lift mandrel completion and a high water-production rate (+97%).
Halliburton proposed a rigless wireline intervention to isolate the water-producing zones. The keys to success for the water shutoff and perforating operation was intensive job preplanning and close collaboration with the client.
barrels of oil per day (BOPD) added
compliance with client’s safety requirements
USD saved
The successful water shutoff job used 4.5-in. sour through-tubing bridge plugs (TTBP) resulting in zero water-cut production. A total of 10 perforating runs successfully perforated 11 new intervals with 100% compliance to the customer’s safety policies.
The customer added 4,000 barrels of oil per day (BOPD) to their production from this single rigless intervention work, which equates to an additional 5% of its daily oil production. The executed job was efficiently performed, saving USD 100,000 off the original rigless intervention work plan.
The customer was highly complimentary of Halliburton and its proper planning, execution, and safety performance throughout the entire job, noting, “The whole crew showed very good dedication to the job. Excellent performance.”