Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Onsite wastewater treatment solution saves operator $280,000

Oxidation solution increased wastewater treatment efficiency at the plant and eliminated the need for more expensive offsite hazardous waste treatment options.

Data Sheet

CorrosaLock™ cement system - Data sheet

Provides enhanced resistance to CO2, lower permeability, and increased elasticity in comparison to conventional Portland cement systems.

Data Sheet

CorrosaCem™ Cement System - Data Sheet

Reduced Portland cement solution for corrosive CO2 environments.

Data Sheet

Abrasive jet cutter - Data sheet

Enables quick rig up, cut from remote location, and rig down quickly to help reduce responder exposure and risks from the source well after a blowout.

Data Sheet

FlexRite® Selective Access (SA) Multilateral Completion System - Data sheet

The FlexRite® SA is designed to select mechanical lateral access for multizone stimulation and intervention

Book

Corporate Governance Guidelines - Book

The Board of Directors of Halliburton Company (the “Company”) has adopted these Guidelines to assist in the exercise of its responsibilities.

Case Study

LWD caliper and drilling mechanics reveal distinct characteristics of geothermal well formations

Advanced technology enables operator to assess and mitigate problematic well conditions previously encountered in the region

Case Study

SmartFleet® diagnoses fracture geometry during simul-frac

Disposable fiber used to diagnose fracture geometry & monitor stimulation growth allowed the operator to see, measure, and act on subsurface fracture behavior

Case Study

New quantifiable operational rig audits lead to improvements

Boots & Coots well control audits help major operator improve safety and efficiency, reducing exposure to well control events and increasing audit scores 22%.

Case Study

Boots & Coots achieve execute well for blowout resolution

Discover how Halliburton's multidisciplinary response resolved a catastrophic blowout crisis in the first attempt in an Indonesian well with no incidents.

Results per page: 102550