Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Curve/lateral drilled with a BHA and a HyperSteer Drill Bit

An operator located in the Midland Basin in Texas doubles percentage of one-run curve/lateral section with less vibration compared to competitor drill bits.

Case Study

40K USD saved from developed core head design

Cut and recovered 180 ft. of 4 in. core in three concurrent 60 ft runs using a single core head in challenging Thebes formation, reducing costs and downtime.

Data Sheet

VersaFlex DTPBA-RL Dual Trip PBA

The VersaFlex® DTBA-RL allows an extended upper PBR to be installed with a drill pipe landing string with the tie-back seal assembly run in later.

Case Study

XtremeGrip® low-ECD ELH systems provides robust alternative

The reduced OD geometry and the hydraulic setting method of the XtremeGrip® LECD ELH system allowed the string to reach the section depth in a well in Norway.

Data Sheet

IntelliFlow™ array production logging services - Data sheet

IntelliFlow provides accurate production profiling using 24 co-located sensors. They measure velocity and phases using capacitance, resistance, and optical sensors.

Case Study

Tracker technology valuable in directional drilling campaign

By harnessing Tracker® gauge pad technology, perform directional drilling operations within lateral sections particularly susceptible to sliding tendencies.

Case Study

SPIDRlive® streams high quality data during fracturing

Spidrlive® self powered data retriever uses low-cost option paired with capture to stream high quality data to offset well data during fracturing campaign.

Brochure

FireStorm® SAGD Electric Submersible Pumping Systems - Brochure

Dependable technology for high-temperature SAGD applications by Halliburton's Summit ESP®

Data Sheet

NO-Dull™ composite seat stage cementer - Data sheet

The NO-Dull™ cementer is a fully composite system that enables a damage-free drillout and reduces drillout time during multiple stage cementing operations.

Article

World Oil - Advances in Drilling / The Evolution of One Run Intervals - Article

Drilling challenges remain the same: drill faster and more efficiently. New technologies are being introduced to evolve to one-run intervals, reducing drilling time

Results per page: 102550