Case Study
MatchSet liner hanger packer system deployed in Bakken Shale
Discover how an operator deployed its longest floated-in liner to date in a cemented production liner application using the MatchSet liner hanger packer system.
Discover the most up-to-date case studies, brochures, data sheets, and other resources from Halliburton
Article
In this edition of Subsurface Insights, we discuss CO2 mineralization within mafic and ultramafic rocks, where carbon is incorporated into the structure of the rock through the crystallization of new, stable carbonate minerals