Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

Dash® sensor sub - Data sheet

Available as part of Halliburton’s premier Veto™ subsea safety system, the Dash® sensor sub provides data acquisition in deep water

Data Sheet

Stoneley Wave Fracture Conductivity Analysis - Data Sheet

Locate and estimate conductivity of fractures crossing a borehole

Case Study

Halliburton collaborates to develop world’s first corrosive hostile environment gun system

Learn how Halliburton developed the world's first CHE™ perforating gun system, allowing safe access to reservoirs in deepwater, corrosive environments

Data Sheet

Armada® SPS-A single-phase sampler - Data sheet

Designed to collect downhole reservoir fluid samples for PVT analysis and withstand highly corrosive reservoir fluids

Case Study

Halliburton integrated abandonment solutions

Halliburton's integrated abandonment solutions offers a comprehensive pre-abandonment diagnosis of wells, allowing the team to address issues effectively.

Case Study

ZoneGuard® HE packer helps reduce NPT for operator

Successful installation in difficult application performed without non-productive time (NPT) saves customer up to seven days compared to a competitor's packer

Case Study

Perenco uses new workflow to create gains in production

Halliburton and Perenco boost offshore Gabon output using MRIL® and RDT™ tools to unlock new zones and optimize reservoir evaluation and completions

Data Sheet

Adaero™ drill bits - Data sheet

Fit-for-purpose roller cone bit platform designed and developed for price-sensitive and less challenging drilling applications.

Data Sheet

Behind pipe evaluation technique (BPETSM) service - Data sheet

BPETSM service is ideal for assessing the composition of annular contents from acoustic and nuclear log responses.

Case Study

Caelus Energy Alaska avoids costly workover and saves USD 3M

Discover how the IntelliScope service identifies low-rate gas leak in a production casing and helps an operator avoid a costly workover of approximately USD 3M.

Results per page: 102550