Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

FireStorm® achieves 1,000+ day run-life milestone in SAGD well

Installed in an incredibly challenging Alberta SAGD well, the FireStorm ESP system has proven its resilience and capabilities with a 1,000+ day run life

Case Study

Summit ESP® recommends lowering ESP into tangent, revenue increases +$26K/day

The team recommended lowering the system to the tangent without pulling the well or changing out equipment, adding about $26,000/day in production revenue.

Case Study

150+ SandRight fallback preventers with no fallback failures

732-day run pulled with all pumps passing API inspection saves $900K in expenses for operation in highly abrasive, corrosive wellbore environment in West Texas

Case Study

Intelevate® remote optimization reduces technician visits

A customer uses Summit’s Intelevate service to remotely optimize roughly one-third of their Permian Basin ESP operations in both New Mexico and Texas.

Article

Intelligent Completions: Sensing through cement

Hart Energy article about DataSphere® array monitoring system and how it’s changing the way we collect real-time data about wellbore conditions.

View

Data Sheet

20-in. RTTS® high-expansion packer - Data sheet

The 20-in. RTTS® High-Expansion packer is part of the industry-acclaimed RTTS packer family and is designed to be used for well suspension, testing, treating and squeeze operations.

Data Sheet

Veto™ 7 Subsea Test Tree - Data Sheet

Veto™ 7 subsea test tree is a hydraulically operated dual “fail-safe closed” valve system designed as a primary well control barrier

Data Sheet

450 RockJet HMX perforating charges - data sheet

RockJet™ shaped perforating charges provide the deepest penetration in actual downhole stressed rock and maximize casing hole size to deliver the greatest possible well performance.

Case Study

New scavenger eliminates H2S concerns in mature offshore well

BaraScav™-1061 safely neutralized H₂S in a 17-year-old GOM well, enabling a successful, efficient, and risk-free permanent plug and abandonment operation

Article

World Oil - Drilling Automation: A System View

Halliburton leads the integration of drilling automation solutions.

Results per page: 102550