Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Pressure drilling service cuts drilling time in half

Utilizing Sperry Drilling Services’ GeoBalance™ Managed Pressure Drilling service, the operator was able to measure, record and display important variables

Case Study

Halliburton revives Latin American fields with development plan

Discover how Halliburton's use innovative solutions and new technologies to revive rapidly declining assets in a mature field located in Latin America.

Data Sheet

Q10™ XLE low noise, low emissions pumping unit - data sheet

Halliburton has built upon the robust Q10™ fluid end design and incorporated noise mitigation technology to reduce sound emissions during stimulation.

Article

Lead Independent Director Charter

The Lead Independent Director at Halliburton coordinates activities among non-management Directors and ensures timely information flow to the Board.

Article

Steam and Air Blowing - Data Sheet

Data Sheet

SurgiFrac® NWB pinpoint stimulation service - Data Sheet

SurgiFrac NWB service removes damage within wellbore, penetrates existing fractures and creates new small/medium-sized fractures, enhancing reservoir performance.

Case Study

Retention loop helps producer meet gas salews specs

Discover how Halliburton's Multi-Chem designs and implements mechanical solution for a gas sweetening challenge, meeting sales specifications consistently.

Data Sheet

QuickPulse™ automated directional gamma service - Data sheet

The QuickPulse automated directional gamma service delivers quick and reliable downhole information in long-lateral drilling to help maximize their asset value.

Case Study

FE program helps client discover more than 400 feet of pay

A Gulf of Mexico operator obtains high-quality formation evaluation, rotary cores, pressues, and fluid samples in deepwater wellbores with Halliburton.

Case Study

Early production facility supports Aullador-1 oil well

Engineered solution works to deliver efficent impementation of modular EPF layout while using the existing equipment and running four years of zero NPT.

Results per page: 102550