Operator controls major loss event in Gulf of Mexico
Halliburton's BaraBlend®-680 lost circulation material helped salvage the well, reduce losses, and move to the production zone while saving over USD $1M.
Veto™ 3 Subsea Safety Tree - Data Sheet
Case Study
Santos adopts engineered solution to avoid stuck pipe incident
Customized drilling fluid increases ROP, saving 1.5 hours of rig time per vertical well, reduces safety exposure, and lowers well cost by USD 600,000.
Case Study
Wellbore cleanout saves customer in Angola 18 Million USD
Halliburton operation helps a customer avoid 90 days of deferred production and a coiled-tubing intervention and saves USD 18 million in Malongo, Angola.
Article
Nominating and Corporate Governance Committee Charter
The Nominating and Corporate Governance Committee of the Board of Directors of Halliburton Company is composed of a minimum of three independent directors.
Case Study
Operation restored with retrofit pump solution
A Permian Basin Operator contacted Summit ESP® to help fix two different surface pump units at one of its saltwater disposal (SWD) facilities in West Texas.
Article
IsoLatch™ Cement Wiper Plugs - Data Sheet
Single-latch casing wiper plugs for reduced risk, improved fluid separation, and wet-shoe operations.
Data Sheet
Process integrity management software - Data sheet
Control and manage the integrity and lifecycle of all joints on industrial pipework, ultimately preventing harmful emission leakage throughout the asset's life.
Brochure
Well integrity services - Brochure
Halliburton's Well Integrity Services team is at the heart of all E&P projects, using industry-leading technology designed to mitigate risk and uncertainty.