Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

GOM operator lowers deepwater drilling days & campaign costs

Sperry Drilling multi-discipline collaboration and analysis helps improves well delivery time by roughly 24% and reduces drilling costs in Gulf of Mexico.

Data Sheet

CobraMax® service - Data sheet

CobraMax stimulation service provides the performance of conventional through tubing fracturing with the speed and versatility of coiled tubing operations

Data Sheet

Hydraulic Hold-Down

Flow activated tool designed for stabilization and anchoring of the BHA. Rated for abrasive slurries and reliable grip inside well tubular

Data Sheet

CobraMax® HJA service - Data sheet

CobraMax HJA Service is a stimulation method incorporating abrasive perforating and a resettable isolation tool to enable high-efficiency treatments

Data Sheet

Hydra-Jet™ SPT - Data sheet

Hydra-Jet self-position tool is a thru-tubing tool that combines jetting technology with a self-bending system that is activated when pressurized.

Case Study

Operator drills 16 days faster on multi-slot platform

Penta Combo BHA featureing GEOTAPP® Tester tool mitigates collision risk as well as high vibration to stay in well path in Paleocene Sands, Indonesia.

Data Sheet

EV0-Trieve and EV0-Trieve HP bridge plugs - Data sheet

The EV0-Trieve™ bridge plug is a high-performance retrievable monobore plugging device that may be set at a predetermined point

Case Study

Drilling 8-½” lateral in one run, setting ROP record

Halliburton's drilling sets a record with its iCruise intelligent rotary steerable system and GeoTech drill bit, perfecting drilling efficiency in North Dakota.

Case Study

Engineered drilling solution reduces vibration and NPT

Discover how Halliburton Sperry Drilling's mud-pulse telemetry service helps operator achieve 100% operating efficiency in the Montney Formation, Canada.

Case Study

Eliminating NPT and maintaining well plan trajectory

Halliburton's real-time advanced survey corrections eliminate non-productive time and maintain well plan trajectory, which reduced well time in Canada.

Results per page: 102550