Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

SPIDR® Self-Powered Intelligent Data Retriever - Data Sheet

The SPIDR® system is used for well testing and well surveillance without wellbore intervention, using hardware to capture wellhead pressure data

Data Sheet

SuperFill™ II Diverter - Data sheet

Discover the SuperFill™ II Diverter, a cutting-edge solution for auto-fill float equipment designed to reduce surge pressure and improve casing run efficiency.

Case Study

Breaking records in the Montney play with iCruise X

4.75-in. iCruise X intelligent rotary steerable system drills 4,734-m lateral under harsh conditions in a single run, and saves the customer 2.5 days.

Data Sheet

Isolizer™ centralizers - Data sheet

Isolizer™ centralizers provide optimal standoff in tight clearance applications.

Case Study

Early production facility used to cleanup and test multiple wells in high-pressure gas field

Halliburton provided an early production facility (EPF) solution resulting in 15 wells cleaned up and tested in record time with zero HSE or quality issues

Data Sheet

EarthStar™ ultra-deep resistivity service - Data sheet

The EarthStar® service offers the industry’s only 3D inversion capability, providing unparalleled visualization of the true reservoir structure

Case Study

Halliburton commended for delivering strategic well campaign

Subsea electrohydraulic (EH) system used to help deploy tubing hanger and provide well barrier isolation as part of an offshore field development campaign.

Case Study

Technology stabilizes wellbore, identifies CO2 injection zones

Discover how Halliburton's BaraXcel™ drill-in fluid helps deliver intact core material from more than a mile below surface with minimal downhole losses.

Case Study

12-zone intelligent completion installed with ZERO issues

Halliburton delivered a 12 zone SmartWell, a world record-breaking installation for Intelligent Completions double the amount of zones ever completed in a single well.

Case Study

Objectives achieved from HP/HT conditions with 2,300 operating hours

Halliburton provided a full DST package for a 6,572 m deep exploration well in order to collect data and samples to further enhance reservoir understanding.

Results per page: 102550