Case Study
Integrated solution saves rig time, boosts reservoir contact
Engineered BHA allowed operator to drill, geosteer, and log reservoir section in one run in one of the longest existing ERD wells, using Geo-Pilot® RSS / Triple-Combo® / Earthstar® / GeoTap® / MRIL® - WD™.