Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Dash® large bore subsea safety system streamlines operations

Electrohydraulic system offers rapid deployment, simplified operations, and streamlines a safe well abandonment solution in two wells in the Gulf of Mexico.

Data Sheet

DeepSqueeze™ system - Data sheet

Perforate and squeeze to remediate cement anomalies in high-pressure environments with Halliburton's DeepSqueeze™ system

Data Sheet

eMotion®-LV remotely operated isolation barrier valve - Data sheet

The eMotion®-LV valve is a computer-controlled, isolation barrier valve that can be repeatedly opened or closed by remote command

Data Sheet

Explosive pipe cutters - Data sheet

Pipe-cutting solutions. A range of explosive cutters for any application where recovery of stuck pipe is required

Case Study

12 Swellpacker systems run successfully in horizontal well

Operator teamed with Halliburton to run multiple oversized Swellpacker systems that would expand and seal in the wellbore after being exposed to oil-based mud.

Case Study

SPECTRUM® provides cluster analysis during millout

Discover how SPECTRUM provided innovative techniques enabling operator in North Dakota to both mill out plugs and analyze cluster efficiency in a single trip.

Case Study

RSS solution delivers success slim hole drilling in Norway

Drilling challenege equipped with Geo-Pilot® RSS in one run in Norwegian continental shelf and land by working with surface data logging in a 5,500 ft space.

Case Study

BaraDrilN X fluid helps customer achieve well testing operation

Enabling operational efficiency and cost savings with BaraDrilN-X, a high-performance, high-stability, water-based HPHT completion fluid

Case Study

BaraSolve and BaraStream solutions save rig time and cost

BaraSolve engineering and BaraStream technology enable significant operational efficiencies and cost savings, creating massive economic value

Case Study

INNOVERT® fluid completes long lateral section in combo well

INNOVERT® fluid solution saved $12.5 million by enabling a cost-effective well extension project in the UAE

Results per page: 102550