Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

EquiFlow AICD ups oil production & lowers water production

Halliburton installs the EquiFlow® autonomous inflow control device in an operator's wells to help restrict water breakthrough and enhance oil production.

Data Sheet

XtremeGrip® MLT System - Data sheet

Offers an integral multilateral self-orienting profile to allow the hanger to provide positive depth

Article

Oilfield Tech - It's all about the reservoir

Kjetil Borgersen, Halliburton Completion Tools, explains how behind-casing monitoring can offer a new perspective on the reservoir.

Case Study

Identifying damaging and performance-hindering vibrations

Cerebro® electronic data capture at the drill bit mitigates stick-slip, while improving ROP and drill bit conditions, allowing drill to kick-off point in 1 run.

Article

Engineered solutions for smarter completions

Halliburton Completion Tools explains how behind-casing monitoring can offer a new perspective on the reservoir

Data Sheet

BaraG-Force™ centrifuges - Data sheet

Designed to process high volumes at high G-forces to optimize drilling fluid performance while simplifying installation, operation and maintenance

Data Sheet

Commander™ full bore - Data sheet

The Halliburton Commander Full Bore cement head is designed specifically to help improve barrier coverage and effectiveness

Case Study

Fas Drill ultra frac plugs reduce millout time and save cost

Discover how the installation of Fas Drill® Ultra composite frac plugs reduces the millout time and delivers significant cost savings for the operator.

Book

2018 Annual & Sustainability Report

The 2018 Annual & Sustainability Report demonstrates Halliburton's execution of strategic priorities, sustainability commitments, and our value proposition.

Case Study

Indirect displacement and wellbore cleanout in deepwater

A successful indirect displacement and wellbore cleanout in a high-angle deepwater well saves an estimated 24 hours of rig time in the Gulf of Mexico.

Results per page: 102550