Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

Hostile array compensated resistivity tool (HACRt™) - Data sheet

Hostile Array Compensated Resistivity Tool (HACRt™) logging system represents the latest thinking in array induction technology for hostile environments

View

Data Sheet

Xaminer® sonic imager service - Data sheet

The Halliburton Xaminer® Sonic Imager (XSI™) service is a step change in acoustic formation evaluation, it provides operators with high-fidelity data

View

Data Sheet

X-Trieve™ HR (AHR) hydraulic-set retrievable production packer - Data sheet

A retrievable, hydraulic-set production packer set in casing to divert casing-to-tubing flow

Case Study

GeoESP® downhole system key for geothermal plant feasibility

Halliburton delivered an advanced geothermal downhole system crucial for assessing the technical and economic viability of a geothermal plant in Germany.

Case Study

GeoESP® Intake showcases geothermal efficiency with triple the runtime

The innovative inflow pattern, extended length, and advanced coatings reduced scale and debris, tripled the run time, and reduced power consumption by 18%.

Case Study

Intelevate increases revenue by $5.8MM in six months

Intelevate's digital platform converted seven wells to ESPs with tailored designs, remote monitoring, and expert support, boosting revenue in six months.

Case Study

Nanotechnology delivers non-aqueous fluid performance on reservoir section

Application of BaraHib Nano high-performance water-based fluid in AsiaPac region reduces filtrate invasion, improves logging efficiency, and boosts production

Case Study

Successful cement operation in region’s first CCUS well

WellLock® resin system provides a corrosion-resistant barrier and delivered excellent zonal isolation in the United Arab Emirate's first CO2 injection well

Case Study

Plug setting aid saves operator two days of rig time

Learn how the BHKA™ plug setting disconnect tool delivered a dependable barrier for the permanent plug and abandonment of a mature-well in the Middle East.

Case Study

Operator lands all casing sections to planned depth

Learn how Protech II™ centralization helped an operator mitigate differential sticking risk to reach total depth in a permeable formation with restrictive IDs.

Results per page: 102550