Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Article

The future of remote operations with managed pressure drilling

Explore the levels of automation in managed pressure drilling (MPD) and what lies in the future of MPD remote operations.

Article

Transition to remote ops highlights need for barrier management

Oil and gas companies are embracing automated systems that can accomplish drilling activities fast, accurately, and without human intervention

Case Study

Halliburton helps client to deliver savings on P&A project

Unfold how the Multi-PSL team delivers a large P&A project ahead of schedule, in turn, producing savied time and saved money in Eastern Canadian region.

Case Study

Halliburton drills fastest directional well in Napo Basin

A client in Ecuador turned to Halliburton to perform its 2016–2017 drilling campaign to maintain production in the Napo Basin, optimizing drilling time.

Case Study

Halliburton increases production in HP/HT, high-H2S field

Halliburton was awarded a multi-service contract from an independent oil company to provide Light Well Intervention Services (LWIS) in the Caspian Sea.

Data Sheet

CoreVault® rock-fluid-pressure - Data sheet

Next-generation reservoir evaluation technology that targets exploration, mature and unconventional reservoirs

Case Study

Combined EarthStar and ADR service geosteer in thin oil sand

EarthStar® and ADR™ services for geosteering in thin oil sand enabled operator to place 1,982 ft in oil pay, realizing an incremental ~USD 310,000 revenue.

Case Study

130 successful junction construction operations deployed

Real-time completion orientation using the workstring orientation tool maintains through-bore access and minimizes rig floor handling in the North Sea.

Case Study

Collaborative services solve P&A project's time and costs

Discover how Halliburton's UK team completes 13 well plug and abandonment projects approximately $36M USD under budget and 126 days ahead of schedule.

Data Sheet

7 5/8-in. FlexRite® multilateral completion system - Data sheet

Enabling deeper TAML 5 multilateral junctions to maximize reservoir production and build upon FlexRite's unrivalled run history and reliability

Results per page: 102550