Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

Veto™ 7 Subsea Test Tree - Data Sheet

Veto™ 7 subsea test tree is a hydraulically operated dual “fail-safe closed” valve system designed as a primary well control barrier

Data Sheet

450 RockJet HMX perforating charges - data sheet

RockJet™ shaped perforating charges provide the deepest penetration in actual downhole stressed rock and maximize casing hole size to deliver the greatest possible well performance.

Case Study

New scavenger eliminates H2S concerns in mature offshore well

BaraScav™-1061 safely neutralized H₂S in a 17-year-old GOM well, enabling a successful, efficient, and risk-free permanent plug and abandonment operation

Article

World Oil - Drilling Automation: A System View

Halliburton leads the integration of drilling automation solutions.

Article

Seeing Clearly Through the Mistie

Discover how DecisionSpace® 365's new ‘Mistie Gridding and Residual Fit’ feature streamlines and enhances the generation of correction and difference outputs

View

Article

Cloud-based seismic processing essentials guide

This cloud-based SeisSpace® processing technology offers a comprehensive set of time and depth processing tools that can be used to process data from field QC (Quality Control) to advanced 4D, multi-component or Migration Velocity Analysis workflows used to feed time and depth migrations.

View

Brochure

Contract and wholesale manufacturing / North America - Brochure

Improve security of supply with concept to full-scale commercial production in the Middle East and North America.

Brochure

Contract and wholesale manufacturing / MENA - Brochure

Improve security of supply with concept to full-scale commercial production in the Middle East and North America.

Case Study

Global milestone achieved- 1,000 eRED® valve installations

Since the first eRED® electronic remote equalizing device deployed in 2008, the proven reliable eRED valve has achieved 1,000 installations globally.

Case Study

Hydro-Helical® helps eliminate emulsion increases production

Hydro-Helical gas separator boosts production from 30 to 150+ BOPD, revitalizing Permian asset and saving up to USD 500K in unnecessary operational costs.

Results per page: 102550